Construction Waterproofing Membrane Inspection Checklist

Comprehensive waterproofing membrane inspection checklist for below-grade and plaza applications.

  • Industry: Construction
  • Frequency: Per application area
  • Estimated Time: 20-30 minutes
  • Role: QC Inspector
  • Total Items: 21
  • Compliance: Manufacturer Specifications, ASTM Standards, Project Specifications

Surface Preparation

Substrate

  • Substrate clean and dry?
  • Concrete adequately cured?
  • Surface smooth (no protrusions)?

Primer

Primer application

  • Primer applied (if required)?
  • Primer dried per manufacturer?

Membrane Application

Main waterproofing

  • Adequate coverage/thickness?
  • Laps properly overlapped and sealed?
  • Terminations properly sealed?
  • Details (penetrations, corners) properly addressed?

Protection

Protection board

  • Protection board installed?
  • Drainage mat installed (if required)?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?

Related Construction Checklists

Related Building Envelope Checklists

Why Use This Construction Waterproofing Membrane Inspection Checklist?

This construction waterproofing membrane inspection checklist helps construction teams maintain compliance and operational excellence. Designed for qc inspector professionals, this checklist covers 21 critical inspection points across 7 sections. Recommended frequency: per application area.

Ensures compliance with Manufacturer Specifications, ASTM Standards, Project Specifications. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Construction Waterproofing Membrane Inspection Checklist cover?

This checklist covers 21 inspection items across 7 sections: Surface Preparation, Primer, Membrane Application, Protection, PPE Compliance, Fall Protection, Housekeeping & Organization. It is designed for construction operations and compliance.

How often should this checklist be completed?

This checklist should be completed per application area. Each completion takes approximately 20-30 minutes.

Who should use this Construction Waterproofing Membrane Inspection Checklist?

This checklist is designed for QC Inspector professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists