Construction Demolition Daily Safety Checklist

Comprehensive demolition daily safety checklist covering OSHA 1926 Subpart T demolition requirements.

  • Industry: Construction
  • Frequency: Daily
  • Estimated Time: 15-20 minutes
  • Role: Demolition Supervisor/Competent Person
  • Total Items: 25
  • Compliance: OSHA 1926.850-860, EPA Regulations, Local Building Codes

Engineering Survey

Pre-demolition

  • Engineering survey on file?
  • Survey current for today's work area?

Utilities

Utility control

  • All utilities disconnected?
  • Disconnection verified with utility companies?

Structural Stability

Building condition

  • Remaining structure stable?
  • Floor openings protected/barricaded?
  • Unsupported walls properly braced?

Hazardous Materials

Asbestos/lead

  • Hazmat survey completed?
  • Hazardous materials removed prior to demolition?

Debris Handling

Waste management

  • Debris chutes secured?
  • Debris removal current?
  • Dust control measures in place?

Hazardous Materials Survey

Verify hazardous material assessment before demolition

  • Asbestos survey completed and reviewed?
  • Lead paint assessment completed?
  • All required abatement completed before work?
  • Air monitoring in place if required?

Structural Stability & Safety

Verify structural stability during demolition operations

  • Engineering demolition plan followed?
  • Exclusion zones established and barricaded?
  • All utilities disconnected and verified?
  • Structural stability assessed before each phase?
  • Site Supervisor Signature

Worker Protection & PPE

Worker safety during demolition operations

  • All workers wearing required demolition PPE?
  • Respiratory protection in use where required?
  • Hearing protection provided and worn?
  • Site perimeter secured with barricades?