Environmental Protection Act 1990 & SDC Construction Waste Segregation
This checklist covers compliance with Construction (Design and Management) Regulations 2015 (CDM 2015) and applicable UK statutory requirements for construction operations. Non-compliance can result in unlimited fines and up to two years imprisonment under CDM Regulations 2015 and HSWA 1974 Section 33.
- Industry: Construction
- Frequency: Quarterly
- Estimated Time: 20-30 minutes
- Role: Site Environmental Manager
- Total Items: 20
- Compliance: Construction (Design and Management) Regulations 2015 (CDM 2015), Health and Safety at Work etc. Act 1974, BS EN 13374, Work at Height Regulations 2005
CDM 2015 Statutory Duties & Notification
Verify Principal Designer appointment, Construction Phase Plan, and HSE F10 notification per CDM 2015.
- Is a Principal Designer appointed in writing for notifiable projects requiring F10 notification to HSE?
- Is the Construction Phase Plan (CPP) prepared, suitable, and communicated to all workers?
- Is an F10 HSE notification submitted (or confirmed not required for non-notifiable works)?
- Attach photo of F10 notification, Construction Phase Plan, and Principal Designer appointment letter:
Pre-Construction Information, Welfare & Induction
Verify pre-construction surveys, welfare provision, and site induction compliance per CDM 2015.
- Are pre-construction surveys (asbestos, ground investigation, services) completed before work starts?
- Is a welfare provision plan in place providing toilets, washing facilities, rest area, and drinking water?
- Is site induction conducted for all workers before they begin work on site?
- Attach photo of pre-construction surveys, welfare facilities inspection, and site induction register:
Temporary Works, Scaffold & CDM File
Verify temporary works design, scaffold inspection, and CDM Health and Safety File compliance.
- Are all temporary works (excavations, propping, falsework) designed, inspected, and certified?
- Is the scaffold inspection register up to date (7-day intervals or after adverse weather)?
- Overall CDM and site safety compliance assessment:
- Attach photo of scaffold inspection tags, temporary works design, and CDM health and safety file:
H&S File, RIDDOR Reporting & Project Closeout
Verify H&S File compilation, RIDDOR incident reporting, and project closeout compliance per CDM 2015.
- Is the Health and Safety File being compiled by the Principal Designer and ready for handover at project completion?
- Is a record of RIDDOR-reportable incidents maintained and reportable incidents submitted to HSE online?
- Number of RIDDOR-reportable incidents on this project to date:
- Principal Contractor or Site Manager certification of inspection:
Corrective Actions & Inspector Sign-Off
Document all deficiencies and assign corrective actions. POPProbe auto-assigns these to team members, generates a signed PDF report instantly, and tracks compliance status across all locations. -> Start free, no credit card required
- List all deficiencies identified in this inspection:
- Overall compliance status?
- Corrective actions assigned to (name and department):
- Inspector digital signature and date:
Related Construction Checklists
- BS EN 13670 & BS 8500 Concrete Structure Construction Quality Audit
- Building Safety Act 2022 & PAS 9980 External Wall Cladding Inspection
- Building Regulations 2010 & CDM 2015 Project Completion Inspection
- Noise at Work Regs 2005 Construction Site Noise Exposure Monitoring
- Building Regs Part B & BS 9999 Passive Fire Protection & Stopping Audit
- Wildlife & Countryside Act 1981 & Habitats Regulations Biodiversity Survey
- PUWER 1998 & CDM 2015 Traffic Management Plan Compliance Audit
- Work at Height Regs 2005 Portable Ladder Daily Inspection Register
Related Site Safety Checklists
- Construction Site Security Checklist - FREE PDF - FREE Download
- Temporary Stairway & Ladder Inspection - FREE PDF - FREE Download
- Floor & Wall Opening Protection - FREE PDF - FREE Download
- Construction Dust Control Inspection Checklist - FREE Download
- Construction Housekeeping Inspection Checklist - FREE Download
- Construction Incident Investigation Checklist - FREE Download
- Construction Job Hazard Analysis Checklist - FREE Download
- Construction Site Safety Orientation Checklist - FREE Download
- Construction Weekly Toolbox Talk Checklist - FREE Download
- Batch 4B Ca Checklist 1 - FREE Download
Why Use This Environmental Protection Act 1990 & SDC Construction Waste Segregation?
This environmental protection act 1990 & sdc construction waste segregation helps construction teams maintain compliance and operational excellence. Designed for site environmental manager professionals, this checklist covers 20 critical inspection points across 5 sections. Recommended frequency: quarterly.
Ensures compliance with Construction (Design and Management) Regulations 2015 (CDM 2015), Health and Safety at Work etc. Act 1974, BS EN 13374, Work at Height Regulations 2005. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What is a Environmental Protection Act 1990 & SDC Construction Waste Segregation?
A Environmental Protection Act 1990 & SDC Construction Waste Segregation is a standardized inspection form used by site environmental manager to ensure consistent construction operations. It contains 27 inspection points organized into 5 sections. FREE PDF - Environmental Protection Act 1990 & SDC Construction Waste Segregation checklist for UK operations. Covers Construction (Design and Management) Regulations 2015 (CDM 2015) requirements. Download FREE template.
How often should I use this construction checklist?
This checklist is designed to be completed quarterly. Regular use ensures compliance with Construction (Design and Management) Regulations 2015 (CDM 2015) and Health and Safety at Work etc. Act 1974 and helps identify issues before they become problems.
Can I download this Environmental Protection Act 1990 & SDC Construction Waste Segregation as a PDF?
Yes, you can download this checklist as a FREE PDF for printing or offline use. The checklist includes 27 fields across 5 sections and typically takes 20-30 minutes to complete.
What compliance standards does this checklist cover?
This checklist helps ensure compliance with Construction (Design and Management) Regulations 2015 (CDM 2015), Health and Safety at Work etc. Act 1974, BS EN 13374, Work at Height Regulations 2005. Following these standards protects your organization and ensures best practices.
How do I complete this construction inspection checklist?
Begin by completing the header fields for Site / Premises Name, Inspection Date, Inspector Name & Title, and Reference / Permit Number. Work through each of the 5 sections, marking items Yes or No as applicable. Add notes for any issues found. Finally, complete the footer fields and add your signature. The entire process takes approximately 20 to 30 minutes.
What are the key sections in this construction checklist?
This construction checklist is organized into 5 key sections: CDM 2015 Statutory Duties & Notification, Pre-Construction Information, Welfare & Induction, Temporary Works, Scaffold & CDM File, H&S File, RIDDOR Reporting & Project Closeout, Corrective Actions & Inspector Sign-Off. Each section contains specific inspection points that site environmental manager must verify. The structured layout ensures nothing is missed during construction inspections and makes the process efficient, typically taking 20-30 minutes to complete.
Who should use this Environmental Protection Act 1990 & SDC Construction Waste Segregation?
This checklist is primarily designed for site environmental manager working in construction operations. However, it is also valuable for quality assurance teams, safety officers, compliance managers, and supervisors who need to verify that construction standards are being met. Organizations of all sizes can benefit from using this Environmental Protection Act 1990 & SDC Construction Waste Segregation to maintain consistency and accountability.