GFCI Outlet Testing Checklist - FREE PDF
Test GFCI outlets and devices for proper operation per OSHA and NEC requirements.
- Industry: Construction / All Industries
- Frequency: Monthly / Before use (construction)
- Estimated Time: 2-3 minutes per device
- Role: Electrician / User
- Total Items: 32
- Compliance: OSHA 1926.405, NFPA 70 NEC, OSHA 1910.304
Pre-Inspection Verification
Verify qualifications and conditions before inspection.
- Inspector authorized/qualified?
- Required documentation available?
- Prior issues addressed?
Condition Assessment
Inspect condition and functionality per OSHA 1926.405.
- Physical condition acceptable?
- All components present and functional?
- Labels/markings legible?
- Properly stored/maintained?
Compliance Verification
Verify compliance with OSHA 1926.405, NFPA 70 NEC, OSHA 1910.304.
- Meets applicable standards?
- Certifications/inspections current?
- User training documented?
Findings and Actions
Document findings and required corrective actions.
- Inspection Result
- Deficiencies Found
- Corrective Actions
- Inspector Signature
Initial Setup & Documentation
Complete initial documentation and preparation
- Inspector / Assessor Name
- Date
- Location / Area
- Inspection Type
- Previous findings reviewed?
Safety & Compliance Verification
Verify all safety requirements are met
- All safety protocols being followed?
- Emergency exits clear and accessible?
- First aid supplies available and stocked?
- All hazards identified and controlled?
- Required PPE being worn correctly?
Operational Standards Check
Verify operational standards and procedures are maintained
- Standard operating procedures being followed?
- All equipment in proper working condition?
- Maintenance schedule current?
- All staff training current and documented?
Quality Assessment
Evaluate quality standards and performance metrics
- Quality standards met for all items checked?
- Any deficiencies or non-conformances identified?
- Root cause analysis completed for issues?
- Continuous improvement opportunities identified?
Related Electrical Safety Checklists
- Temporary Electrical Wiring Inspection - FREE PDF
- Portable Electrical Tool Inspection - FREE PDF
- Temporary Electrical Wiring Inspection - FREE PDF
- Electrical Work Permit - FREE PDF
- Electrical Qualified Person Verification - FREE PDF
- Battery Handling & Storage (EV/Hybrid) Checklist
- High Voltage EV Safety Checklist
Related Electrical Equipment Checklists
- Temporary Electrical Wiring Inspection - FREE PDF - FREE Download
- Portable Electrical Tool Inspection - FREE PDF - FREE Download
Why Use This GFCI Outlet Testing Checklist?
This gfci outlet testing checklist helps construction / all industries teams maintain compliance and operational excellence. Designed for electrician / user professionals, this checklist covers 32 critical inspection points across 8 sections. Recommended frequency: monthly / before use (construction).
Ensures compliance with OSHA 1926.405, NFPA 70 NEC, OSHA 1910.304. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the GFCI Outlet Testing Checklist cover?
This checklist covers 32 inspection items across 8 sections: Pre-Inspection Verification, Condition Assessment, Compliance Verification, Findings and Actions, Initial Setup & Documentation, Safety & Compliance Verification, Operational Standards Check, Quality Assessment. It is designed for construction / all industries operations and compliance.
How often should this checklist be completed?
This checklist should be completed monthly / before use (construction). Each completion takes approximately 2-3 minutes per device.
Who should use this GFCI Outlet Testing Checklist?
This checklist is designed for Electrician / User professionals in the construction / all industries industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.