Public EV Charging Infrastructure Inspection Checklist [FREE PDF]
Utility inspectors and charging network operators use this checklist per NEC Article 625 and NEVI (National Electric Vehicle Infrastructure) Formula Program standards for public charging station inspection.
- Industry: Energy & Utilities / Transportation
- Frequency: Quarterly
- Estimated Time: 15-20 minutes
- Role: Charging Network Technician
- Total Items: 8
- Compliance: NEC Article 625, NEVI Formula Program
Station Condition & Functionality
Inspect charging station physical and functional condition.
- Are all charging connectors (CCS, CHAdeMO, NACS) undamaged and engaging properly?
- Are all charger units powering on and successfully initiating charge sessions?
- Are payment systems (credit card reader, app) functional per NEVI uptime requirements?
- Station condition notes
Safety & ADA Accessibility
Verify station safety and ADA compliance.
- Is the charging area well-lit for nighttime use and personal safety?
- Is at least one charging space ADA-accessible with proper clearances?
- Is directional and identification signage posted per NEVI requirements?
- Safety and accessibility notes
Related Energy Utilities Checklists
- Utility Pole & Overhead Line Inspection Checklist [FREE PDF]
- Solar Panel Installation Inspection Checklist
- Hydroelectric Dam Safety Inspection
- Electrical Substation Safety Inspection Checklist [FREE PDF]
Why Use This Public EV Charging Infrastructure Inspection Checklist [FREE PDF]?
This public ev charging infrastructure inspection checklist [free pdf] helps energy & utilities / transportation teams maintain compliance and operational excellence. Designed for charging network technician professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: quarterly.
Ensures compliance with NEC Article 625, NEVI Formula Program. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Public EV Charging Infrastructure Inspection Checklist [FREE PDF] cover?
This checklist covers 8 inspection items across 2 sections: Station Condition & Functionality, Safety & ADA Accessibility. It is designed for energy & utilities / transportation operations and compliance.
How often should this checklist be completed?
This checklist should be completed quarterly. Each completion takes approximately 15-20 minutes.
Who should use this Public EV Charging Infrastructure Inspection Checklist [FREE PDF]?
This checklist is designed for Charging Network Technician professionals in the energy & utilities / transportation industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.