Brownfield Site Assessment Phase I/II Checklist [FREE PDF]

This brownfield site assessment phase i/ii checklist ensures compliance with ASTM E1527-21 Phase I Environmental Site Assessment requirements. Environmental Professional (EP)s use this checklist to document compliance, identify deficiencies, and maintain regulatory standing.

  • Industry: Real Estate / Development
  • Frequency: Per Assessment
  • Estimated Time: 8-40 hours
  • Role: Environmental Professional (EP)
  • Total Items: 21
  • Compliance: ASTM E1527-21 Phase I Environmental Site Assessment, EPA AAI 40 CFR Part 312, ASTM E1903 Phase II Site Assessment, EPA Brownfield Assessment Standards

Pre-Inspection Documentation

Verify records, permits, and prior findings before beginning inspection.

  • All required permits and registrations current and available?
  • Prior violation corrective actions verified as complete?
  • Emergency response plan current and distributed?
  • Required inspection records from prior periods complete?

Operational Compliance

Verify day-to-day operational compliance with regulatory requirements.

  • All required operational procedures being followed?
  • Required monitoring and sampling up to date?
  • All permitted limits (discharge, emissions, etc.) currently being met?
  • Logbooks and operational records current and complete?
  • All personnel current on required regulatory training?

Equipment and Systems Condition

Inspect treatment, containment, and monitoring equipment.

  • All required treatment and control equipment operational?
  • Alarms and automatic shutoffs functional?
  • Secondary containment structures intact and free of defects?
  • Monitoring equipment calibrated and within calibration date?

Recordkeeping and Reporting

Verify recordkeeping meets regulatory requirements.

  • All required records maintained and legible?
  • Required regulatory reports submitted on schedule?
  • Electronic records backed up and accessible?
  • Recordkeeping findings and gaps

Findings and Closeout

Document inspection findings and corrective action plans.

  • Any regulatory violations or deficiencies identified?
  • Corrective actions documented with responsible party and due date?
  • Photo documentation of findings?
  • Inspector findings and recommendations

Related Environmental Checklists

Why Use This Brownfield Site Assessment Phase I/II Checklist [FREE PDF]?

This brownfield site assessment phase i/ii checklist [free pdf] helps real estate / development teams maintain compliance and operational excellence. Designed for environmental professional (ep) professionals, this checklist covers 21 critical inspection points across 5 sections. Recommended frequency: per assessment.

Ensures compliance with ASTM E1527-21 Phase I Environmental Site Assessment, EPA AAI 40 CFR Part 312, ASTM E1903 Phase II Site Assessment, EPA Brownfield Assessment Standards. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Brownfield Site Assessment Phase I/II Checklist [FREE PDF] cover?

This checklist covers 21 inspection items across 5 sections: Pre-Inspection Documentation, Operational Compliance, Equipment and Systems Condition, Recordkeeping and Reporting, Findings and Closeout. It is designed for real estate / development operations and compliance.

How often should this checklist be completed?

This checklist should be completed per assessment. Each completion takes approximately 8-40 hours.

Who should use this Brownfield Site Assessment Phase I/II Checklist [FREE PDF]?

This checklist is designed for Environmental Professional (EP) professionals in the real estate / development industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists