Pre-Inspection Setup
Initial preparation and documentation review.
- Inspection scope defined?
- Previous findings reviewed?
- Documentation available?
- Personnel notified?
- Inspection tools prepared?
Documentation Review
Verify documentation completeness and accuracy.
- Procedures current and approved?
- Required records complete?
- Retention requirements met?
- Training documentation current?
- Certifications/licenses valid?
Physical Inspection
Direct observation of equipment, conditions, and practices.
- Equipment in good condition?
- Safety devices functional?
- Labeling and signage correct?
- Housekeeping adequate?
- Access and egress clear?
- Required PPE available?
Compliance Verification
Verify compliance with NFPA 70, OSHA requirements.
- Regulatory requirements met?
- Permits and approvals current?
- Procedures being followed?
- Monitoring systems adequate?
- Corrective action process effective?
Hazard Assessment
Identify and evaluate potential hazards.
- Hazards identified and documented?
- Control measures effective?
- Any new hazards identified?
- Recent incidents reviewed?
Findings and Corrective Actions
Document findings and required follow-up actions.
- All findings documented?
- Priority levels assigned?
- Root cause analysis needed?
- Corrective actions assigned?
- Follow-up verification scheduled?
- Overall Status
- Summary Notes
Related Facilities Checklists
- Electrical Room Inspection
- Emergency Generator Load Bank Test
- Recording Studio Safety and Equipment Compliance Checklist
- Emergency Generator Testing Checklist
- Dock Leveler Inspection Checklist
- Roof Access Safety Inspection
- Storm Emergency Preparedness Checklist
- Power Outage Response Checklist
Related Electrical Systems Checklists
- Emergency Generator Testing Checklist - FREE Download
- Electrical Panel Thermographic Survey - FREE Download
- Lighting System Audit - FREE Download
- Electrical Grounding System Inspection - FREE Download
- Electrical Room Inspection - FREE Download
- Emergency Generator Load Bank Test - FREE Download
- Recording Studio Safety and Equipment Compliance Checklist - FREE Download
Why Use This GFCI Outlet Testing Checklist?
This gfci outlet testing checklist helps facilities teams maintain compliance and operational excellence. Designed for electrician professionals, this checklist covers 32 critical inspection points across 6 sections. Recommended frequency: as needed.
Ensures compliance with NFPA 70, OSHA. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the GFCI Outlet Testing Checklist cover?
This checklist covers 32 inspection items across 6 sections: Pre-Inspection Setup, Documentation Review, Physical Inspection, Compliance Verification, Hazard Assessment, Findings and Corrective Actions. It is designed for facilities operations and compliance.
How often should this checklist be completed?
This checklist should be completed as needed. Each completion takes approximately 30-45 minutes.
Who should use this GFCI Outlet Testing Checklist?
This checklist is designed for Electrician professionals in the facilities industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.