Traffic Signal & Intersection Maintenance Checklist [FREE PDF]

Traffic engineers and signal technicians use this checklist for traffic signal maintenance per MUTCD signal timing and operation standards and NEMA TS2 traffic signal controller specifications.

  • Industry: Government / Transportation
  • Frequency: Monthly
  • Estimated Time: 20-25 minutes
  • Role: Traffic Signal Technician
  • Total Items: 8
  • Compliance: MUTCD Part 4, NEMA TS2

Signal Operation & Timing

Verify traffic signal operation and timing plans.

  • Are all signal indications (red, yellow, green) displaying correctly?
  • Are signal timing plans operating per approved traffic engineering parameters?
  • Are pedestrian signals and push buttons functioning at all crosswalks?
  • Signal operation notes

Hardware & Safety Equipment

Inspect signal hardware, cabinet, and conflict monitor.

  • Is the conflict monitor/malfunction management unit tested and operational?
  • Are LED signal modules bright with no burned-out sections?
  • Is the signal cabinet secure, ventilated, and free of water intrusion?
  • Hardware notes

Related Government Checklists

Related Infrastructure Checklists

Why Use This Traffic Signal & Intersection Maintenance Checklist [FREE PDF]?

This traffic signal & intersection maintenance checklist [free pdf] helps government / transportation teams maintain compliance and operational excellence. Designed for traffic signal technician professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: monthly.

Ensures compliance with MUTCD Part 4, NEMA TS2. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Traffic Signal & Intersection Maintenance Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Signal Operation & Timing, Hardware & Safety Equipment. It is designed for government / transportation operations and compliance.

How often should this checklist be completed?

This checklist should be completed monthly. Each completion takes approximately 20-25 minutes.

Who should use this Traffic Signal & Intersection Maintenance Checklist [FREE PDF]?

This checklist is designed for Traffic Signal Technician professionals in the government / transportation industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists