Solar Farm Installation & Maintenance Safety Checklist #28

This checklist supports safe installation and maintenance of utility-scale solar PV systems. It is designed for EPC and O&M teams to verify electrical safety, lockout/tagout, fall protection, panel and inverter inspections, and documentation aligned with NEC Article 690, NFPA 70E, and OSHA requirements.

  • Industry: Energy / Utilities / Infrastructure
  • Frequency: Daily (each shift)
  • Estimated Time: 30-45 minutes
  • Role: Solar O&M Supervisor / Site Safety Officer
  • Total Items: 35
  • Compliance: NEC (NFPA 70) Article 690 Solar Photovoltaic (PV) Systems, NFPA 70E Standard for Electrical Safety in the Workplace, OSHA 29 CFR 1910 Subpart S Electrical, OSHA 29 CFR 1910.147 Control of Hazardous Energy (LOTO), OSHA 29 CFR 1926 Subpart M Fall Protection

Pre-Job Briefing & Permits

Confirm task planning, permits, and hazard controls before work begins.

  • Job Hazard Analysis (JHA/JSA) completed and reviewed?
  • Permit-to-work issued where required (electrical, hot work, confined space)?
  • Utility locates verified before digging/driving piles?
  • Briefing notes / hazards identified
  • Photo of toolbox talk sign-in sheet

Electrical Isolation, LOTO & Verification

Verify lockout/tagout, de-energization, and absence-of-voltage testing prior to work.

  • LOTO applied to all energy sources (AC/DC) as required?
  • Absence-of-voltage verified with properly rated meter?
  • Arc flash boundaries and PPE category communicated?
  • Photo of applied locks/tags (no sensitive info)
  • Isolation verification notes

PV Array, Racking & Panel Inspection

Inspect modules, racking, and mechanical integrity to prevent failures and electrical hazards.

  • Modules free of cracks, hot spots, or broken glass?
  • Racking/torque checks within spec; no loose fasteners?
  • Cables properly managed (no abrasion, pinch, or UV damage)?
  • Photo of array condition / racking sample
  • Array inspection notes

Inverters, Combiner Boxes & Disconnects

Confirm safe condition of power electronics and switching equipment.

  • Enclosures closed, gasketed, and latched; no water ingress?
  • Disconnects and circuits labeled correctly per as-builts?
  • Thermal scan conducted where scheduled; hotspots addressed?
  • Photo of inverter/combiner exterior condition
  • Inverter/combiner findings

Working at Heights & Access

Verify fall protection, access controls, and safe ladder/scaffold use where applicable.

  • Fall protection plan implemented for elevated work?
  • Harness/lanyard inspected and in date?
  • Ladders/scaffolds inspected; set up on stable ground?
  • Photo of access/fall protection setup
  • Working-at-heights notes

Testing, Commissioning & Documentation

Ensure testing follows standards and results are recorded for turnover and audits.

  • IV curve/string testing performed as required?
  • Ground fault/insulation resistance checks completed?
  • As-builts and one-lines updated to reflect changes?
  • Photo of test report excerpt (no sensitive info)
  • Testing/commissioning notes

Incident Reporting, Corrective Actions & QAPI

Capture issues, assign owners, and verify closure for continuous improvement.

  • Near misses and hazards logged per site policy?
  • Corrective actions assigned with owner and due date?
  • Safety metrics reviewed (TRIR, electrical incidents, LOTO violations)?
  • Photo evidence (if applicable)
  • Incident / corrective action notes

Related Infrastructure Checklists

Related Solar Farm Checklists

Why Use This Solar Farm Installation & Maintenance Safety Checklist #28?

This solar farm installation & maintenance safety checklist #28 helps energy / utilities / infrastructure teams maintain compliance and operational excellence. Designed for solar o&m supervisor / site safety officer professionals, this checklist covers 35 critical inspection points across 7 sections. Recommended frequency: daily (each shift).

Ensures compliance with NEC (NFPA 70) Article 690 Solar Photovoltaic (PV) Systems, NFPA 70E Standard for Electrical Safety in the Workplace, OSHA 29 CFR 1910 Subpart S Electrical, OSHA 29 CFR 1910.147 Control of Hazardous Energy (LOTO), OSHA 29 CFR 1926 Subpart M Fall Protection, IEEE 1547 Interconnection (as applicable). Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Solar Farm Installation & Maintenance Safety Checklist #28 cover?

This checklist covers 35 inspection items across 7 sections: Pre-Job Briefing & Permits, Electrical Isolation, LOTO & Verification, PV Array, Racking & Panel Inspection, Inverters, Combiner Boxes & Disconnects, Working at Heights & Access, Testing, Commissioning & Documentation, Incident Reporting, Corrective Actions & QAPI. It is designed for energy / utilities / infrastructure operations and compliance.

How often should this checklist be completed?

This checklist should be completed daily (each shift). Each completion takes approximately 30-45 minutes.

Who should use this Solar Farm Installation & Maintenance Safety Checklist #28?

This checklist is designed for Solar O&M Supervisor / Site Safety Officer professionals in the energy / utilities / infrastructure industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists