Work Order Release Checklist
This checklist standardizes work order release checklist to improve throughput, quality, and safety in manufacturing environments. Use it to document controls, capture deviations, and assign corrective actions with sign-off.
- Industry: Manufacturing & Industrial
- Frequency: As Needed
- Estimated Time: 25-40 minutes
- Role: Maintenance Manager
- Total Items: 45
- Compliance: OSHA 29 CFR 1910 Subpart D (Walking-Working Surfaces)
Planning & Documentation
Confirm work orders, batch records, and required documents.
- SOP followed with no skipped steps?
- Any issues found that require escalation?
- Corrective action assigned and tracked?
- Time spent on this section
- Notes
Safety & PPE
Verify PPE, hazard controls, and safe work permits.
- SOP followed with no skipped steps?
- Any issues found that require escalation?
- Corrective action assigned and tracked?
- Time spent on this section
- Photo evidence
Process Execution
Verify SOP steps, parameters, and operator checks.
- SOP followed with no skipped steps?
- Any issues found that require escalation?
- Corrective action assigned and tracked?
- Output recorded
- Notes
Quality & Release
Verify inspections, records, and release/hold decisions.
- SOP followed with no skipped steps?
- Any issues found that require escalation?
- Corrective action assigned and tracked?
- Defects found
- Photo evidence
Equipment & Maintenance
Verify equipment readiness, defects tagging, and PM status.
- SOP followed with no skipped steps?
- Any issues found that require escalation?
- Corrective action assigned and tracked?
- Time spent on this section
- Photo evidence
Materials & Inventory Control
Verify staging, traceability, and correct material usage.
- SOP followed with no skipped steps?
- Any issues found that require escalation?
- Corrective action assigned and tracked?
- Lots/serials captured (count)
- Notes
Environmental & Utilities
Verify utilities, emissions/waste controls, and environmental logs.
- SOP followed with no skipped steps?
- Any issues found that require escalation?
- Corrective action assigned and tracked?
- Time spent on this section
- Photo evidence
Issues & CAPA
Document issues, assign owners, and verify corrective action.
- SOP followed with no skipped steps?
- Any issues found that require escalation?
- Corrective action assigned and tracked?
- Time spent on this section
- Photo evidence
QA, Corrective Actions & Sign-Off
Confirm completion, prioritize issues, and capture signatures for accountability.
- QA review completed?
- Any critical issues still open?
- Overall risk level
- Supervisor Signature
- Quality/EHS Signature
Related Manufacturing Industrial Checklists
- Daily Production Meeting Checklist
- Bottleneck Walk Checklist
- OEE Tracking Checklist
- Material Staging Checklist
- Finished Goods Transfer Checklist
- Scrap & Rework Handling Checklist
- Tooling Setup Checklist
- Mold/Die Change Checklist
Related Production Ops Checklists
- Industrial Manufacturing Shift Startup Checklist - FREE Download
- Shift Handoff Checklist - FREE Download
- Line Changeover Checklist - FREE Download
- Startup Safety Brief Checklist - FREE Download
- Daily Production Meeting Checklist - FREE Download
- Bottleneck Walk Checklist - FREE Download
- OEE Tracking Checklist - FREE Download
- Material Staging Checklist - FREE Download
- Finished Goods Transfer Checklist - FREE Download
- Scrap & Rework Handling Checklist - FREE Download
Why Use This Work Order Release Checklist?
This work order release checklist helps manufacturing & industrial teams maintain compliance and operational excellence. Designed for maintenance manager professionals, this checklist covers 45 critical inspection points across 9 sections. Recommended frequency: as needed.
Ensures compliance with OSHA 29 CFR 1910 Subpart D (Walking-Working Surfaces). Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Work Order Release Checklist cover?
This checklist covers 45 inspection items across 9 sections: Planning & Documentation, Safety & PPE, Process Execution, Quality & Release, Equipment & Maintenance, Materials & Inventory Control, Environmental & Utilities, Issues & CAPA, QA, Corrective Actions & Sign-Off. It is designed for manufacturing & industrial operations and compliance.
How often should this checklist be completed?
This checklist should be completed as needed. Each completion takes approximately 25-40 minutes.
Who should use this Work Order Release Checklist?
This checklist is designed for Maintenance Manager professionals in the manufacturing & industrial industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.