Lockout/Tagout (LOTO) Procedure Audit - FREE PDF
Audit lockout/tagout program to ensure hazardous energy control compliance.
- Industry: Manufacturing
- Frequency: Annually
- Estimated Time: 2-4 hours
- Role: Safety Manager
- Total Items: 28
- Compliance: OSHA 1910.147, OSHA 1910.269, NFPA 70E
Header Information
Complete header fields for this inspection.
- Location/Site
- Date
- Inspector Name
- Reference/Permit Number
Pre-Inspection Verification
Verify conditions before beginning inspection.
- Required documentation available?
- Inspection equipment ready?
- Area accessible and safe?
- Required PPE worn?
Primary Inspection Points
Complete main inspection items.
- Primary condition acceptable?
- Secondary systems functional?
- Safety features operational?
- Labeling/marking compliant?
- No visible damage or wear?
- Maintenance current?
Compliance & Standards
Verify regulatory compliance requirements.
- Applicable standards met?
- Required records current?
- Personnel training verified?
- Required permits/certifications valid?
Safety & Hazard Assessment
Evaluate safety conditions and hazards.
- Hazards identified and controlled?
- Emergency provisions adequate?
- Access/egress clear?
- Housekeeping acceptable?
Findings & Corrective Actions
Document inspection findings and required actions.
- Overall Condition/Rating
- Deficiencies Found
- Corrective Actions Required
- Follow-up Date
- Inspector Signature
- Supervisor Signature
Related Manufacturing Checklists
- Energized Electrical Work Permit - FREE PDF
- Motor Control Center (MCC) Inspection - FREE PDF
- Electrical Safety Program Audit - FREE PDF
- Mexico NOM-022-STPS Static Electricity Checklist
- Confined Space Entry Permit - FREE PDF
- Confined Space Atmospheric Testing Log - FREE PDF
- Confined Space Rescue Equipment Inspection - FREE PDF
- Confined Space Hazard Assessment - FREE PDF
Related Electrical Safety Checklists
- Arc Flash Hazard Assessment - FREE PDF - FREE Download
- Energized Electrical Work Permit - FREE PDF - FREE Download
- Motor Control Center (MCC) Inspection - FREE PDF - FREE Download
- Electrical Safety Program Audit - FREE PDF - FREE Download
- Mexico NOM-022-STPS Static Electricity Checklist - FREE Download
- Mexico NOM-029-STPS Electrical Maintenance Checklist - FREE Download
Why Use This Lockout/Tagout (LOTO) Procedure Audit?
This lockout/tagout (loto) procedure audit helps manufacturing teams maintain compliance and operational excellence. Designed for safety manager professionals, this checklist covers 28 critical inspection points across 6 sections. Recommended frequency: annually.
Ensures compliance with OSHA 1910.147, OSHA 1910.269, NFPA 70E. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Lockout/Tagout (LOTO) Procedure Audit cover?
This checklist covers 28 inspection items across 6 sections: Header Information, Pre-Inspection Verification, Primary Inspection Points, Compliance & Standards, Safety & Hazard Assessment, Findings & Corrective Actions. It is designed for manufacturing operations and compliance.
How often should this checklist be completed?
This checklist should be completed annually. Each completion takes approximately 2-4 hours.
Who should use this Lockout/Tagout (LOTO) Procedure Audit?
This checklist is designed for Safety Manager professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.