UK PUWER Work Equipment Assessment Checklist

Comprehensive UK PUWER work equipment assessment checklist.

  • Industry: Manufacturing
  • Frequency: Annual/Before first use
  • Estimated Time: 30-45 minutes
  • Role: Competent Person
  • Total Items: 22
  • Compliance: PUWER 1998, HSE L22, LOLER 1998

Suitability

Equipment suitability

  • Suitable for intended purpose?
  • Suitable for working conditions?

Guarding

Dangerous parts

  • All guards in place?
  • Guards effective?
  • Interlocks working?

Controls

Control systems

  • Controls easily accessible?
  • Emergency stop functional?
  • Controls clearly labelled?

Maintenance

Maintenance requirements

  • Maintenance schedule in place?
  • Maintenance records kept?

Training & Information

User training

  • Operators trained?
  • Operating instructions available?

Machine Guarding & Safety

OSHA 1910 Subpart O machine safety

  • Machine guards in place and functional?
  • Emergency stop buttons tested?
  • Safety light curtains operational?
  • Safety interlocks functional?

Chemical & Hazardous Materials

HazCom and chemical safety per OSHA 1910.1200

  • SDS sheets available for all chemicals?
  • All chemical containers properly labeled?
  • Secondary containment in place?

Ergonomics & Workplace Design

Ergonomic risk assessment

  • Workstation heights appropriate?
  • Lifting aids available where needed?
  • Anti-fatigue mats at standing stations?

Related Manufacturing Checklists

Related Equipment Safety Checklists

Why Use This UK PUWER Work Equipment Assessment Checklist?

This uk puwer work equipment assessment checklist helps manufacturing teams maintain compliance and operational excellence. Designed for competent person professionals, this checklist covers 22 critical inspection points across 8 sections. Recommended frequency: annual/before first use.

Ensures compliance with PUWER 1998, HSE L22, LOLER 1998. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the UK PUWER Work Equipment Assessment Checklist cover?

This checklist covers 22 inspection items across 8 sections: Suitability, Guarding, Controls, Maintenance, Training & Information, Machine Guarding & Safety, Chemical & Hazardous Materials, Ergonomics & Workplace Design. It is designed for manufacturing operations and compliance.

How often should this checklist be completed?

This checklist should be completed annual/before first use. Each completion takes approximately 30-45 minutes.

Who should use this UK PUWER Work Equipment Assessment Checklist?

This checklist is designed for Competent Person professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists