NBC 2016 IS 2190 Portable Fire Extinguisher Monthly Inspection
This checklist covers compliance requirements under National Building Code 2016 Part 4 and applicable Indian regulations for manufacturing operations. Non-compliance can result in municipal Fire NOC revocation, penalties under State Fire Services Act, and operational shutdown order.
- Industry: Manufacturing
- Frequency: Quarterly
- Estimated Time: 25-35 minutes
- Role: Facility Safety Officer
- Total Items: 20
- Compliance: National Building Code 2016 Part 4, State Fire Services Act, IS 2190, TAC Rules, IS 15908
Regulatory Licences & Statutory Compliance
Verify all applicable Indian regulatory licences, registrations, and periodic returns are current.
- Are all applicable central and state regulatory licences, registrations, and permits current and displayed?
- Have all mandatory statutory returns and reports been filed with the relevant authorities on time?
- Is a designated compliance officer/manager appointed with documented responsibilities?
- Attach photo of regulatory licences, statutory returns, and compliance officer appointment:
Safety Inspections & PPE Compliance
Verify safety inspection currency, PPE provision, and training records.
- Are all mandatory safety inspections carried out by competent persons at required frequencies?
- Are workers provided appropriate PPE and trained in its correct use and maintenance?
- Number of open non-compliances from last inspection or audit:
- Attach photo of PPE issuance register, inspection records, and training certificates:
Emergency Preparedness & Statutory Registers
Verify emergency response procedures, drill records, and statutory register maintenance.
- Are emergency response procedures documented, practiced through drills, and records maintained?
- Are all statutory registers (accidents, dangerous occurrences, medical examinations) maintained correctly?
- Overall compliance with applicable Indian regulatory requirements:
- Attach photo of emergency drill records, statutory registers, and compliance certificates:
Previous Regulatory Findings & Action Tracking
Review prior regulatory findings, pending renewals, and supervisor acknowledgment.
- Have all findings from previous regulatory inspections, audits, and notices been resolved and verified?
- Is management aware of upcoming regulatory renewals and submissions in the next 90 days?
- Number of open compliance actions assigned from this inspection:
- Responsible Manager or Occupier certification of inspection:
Corrective Actions & Inspector Sign-Off
Document all deficiencies and assign corrective actions. POPProbe auto-assigns these to team members, generates a signed PDF report instantly, and tracks compliance status across all locations. -> Start free, no credit card required
- List all deficiencies identified in this inspection:
- Overall compliance status?
- Corrective actions assigned to (name and department):
- Inspector digital signature and date:
Related Manufacturing Checklists
- Mines Act 1952 Section 23 Mine Emergency Escape Route Inspection
- DGMS Mines Explosives Regulations Shot Firer Competency Records Audit
- NBC 2016 Part 4 Hazardous Occupancy Chemical Plant Fire Safety
- IS 2190 Portable Fire Extinguisher Selection Siting & Maintenance
- Contract Labour (R&A) Act 1970 Principal Employer Compliance Audit
- Contract Labour Act 1970 Registration Certificate & Licence Audit
- EPF & MP Act 1952 and ESI Act 1948 Employer Compliance Audit
- Minimum Wages Act 1948 & Code on Wages 2019 Compliance Checklist
Related Fire Safety Checklists
- NFPA 101 Industrial Occupancy Annual Fire & Life Safety Audit - FREE Download
- NFPA 10 Portable Fire Extinguisher Monthly Inspection Checklist - FREE Download
- NFPA 10 Portable Fire Extinguisher Annual Maintenance Checklist - FREE Download
- NFPA 110 Emergency & Standby Power System Inspection Checklist - FREE Download
- NFPA 600 Private Fire Brigade Training & Readiness Audit - FREE Download
- OSHA 29 CFR 1910.39 Fire Prevention Plan Compliance Checklist - FREE Download
- NFPA 11 Low Medium High-Expansion Foam System Inspection - FREE Download
- OSHA 29 CFR 1910.155 Fire Safety Definitions & Program Audit - FREE Download
- NFPA 120 Coal Preparation Facilities Fire Protection Checklist - FREE Download
- NFPA 122 Fire Prevention in Metal Mining & Metal Ore Processing - FREE Download
Why Use This NBC 2016 IS 2190 Portable Fire Extinguisher Monthly Inspection?
This nbc 2016 is 2190 portable fire extinguisher monthly inspection helps manufacturing teams maintain compliance and operational excellence. Designed for facility safety officer professionals, this checklist covers 20 critical inspection points across 5 sections. Recommended frequency: quarterly.
Ensures compliance with National Building Code 2016 Part 4, State Fire Services Act, IS 2190, TAC Rules, IS 15908. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the NBC 2016 IS 2190 Portable Fire Extinguisher Monthly Inspection cover?
This checklist covers 20 inspection items across 5 sections: Regulatory Licences & Statutory Compliance, Safety Inspections & PPE Compliance, Emergency Preparedness & Statutory Registers, Previous Regulatory Findings & Action Tracking, Corrective Actions & Inspector Sign-Off. It is designed for manufacturing operations and compliance.
How often should this checklist be completed?
This checklist should be completed quarterly. Each completion takes approximately 25-35 minutes.
Who should use this NBC 2016 IS 2190 Portable Fire Extinguisher Monthly Inspection?
This checklist is designed for Facility Safety Officer professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.