Ship Fuel Bunkering Operations Safety Checklist [FREE PDF]
Ship officers and terminal operators use this checklist per MARPOL Annex VI fuel quality requirements and ISGOTT (International Safety Guide for Oil Tankers and Terminals) bunkering safety procedures.
- Industry: Maritime
- Frequency: Per Bunkering
- Estimated Time: 15-20 minutes
- Role: Chief Engineer / Duty Officer
- Total Items: 8
- Compliance: MARPOL Annex VI, ISGOTT
Pre-Bunkering Checks
Verify pre-bunkering safety checks and communication.
- Has the ship/shore safety checklist been completed and signed by both parties?
- Are deck scuppers plugged and drip trays positioned under bunker manifold connections?
- Is communication established between vessel and bunker barge/terminal for emergency stop?
- Pre-bunkering notes
During & Post Bunkering
Monitor bunkering operations and verify completion.
- Are tank levels monitored continuously to prevent overflow?
- Are fuel samples taken per MARPOL for quality verification and retained?
- Is the Bunker Delivery Note (BDN) received, verified, and retained for 3 years?
- During and post bunkering notes
Related Marine Checklists
- Marina Facility Safety Inspection Checklist [FREE PDF]
- Marina Dock Safety Inspection Checklist
- Marine Vessel Safety Inspection Checklist
- Vessel Lifesaving Appliance Inspection Checklist [FREE PDF]
Why Use This Ship Fuel Bunkering Operations Safety Checklist [FREE PDF]?
This ship fuel bunkering operations safety checklist [free pdf] helps maritime teams maintain compliance and operational excellence. Designed for chief engineer / duty officer professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: per bunkering.
Ensures compliance with MARPOL Annex VI, ISGOTT. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Ship Fuel Bunkering Operations Safety Checklist [FREE PDF] cover?
This checklist covers 8 inspection items across 2 sections: Pre-Bunkering Checks, During & Post Bunkering. It is designed for maritime operations and compliance.
How often should this checklist be completed?
This checklist should be completed per bunkering. Each completion takes approximately 15-20 minutes.
Who should use this Ship Fuel Bunkering Operations Safety Checklist [FREE PDF]?
This checklist is designed for Chief Engineer / Duty Officer professionals in the maritime industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.