Oil and Gas Management of Change (MOC) Review Checklist

Management of Change failures are a leading cause of process safety incidents. This checklist ensures all changes at oil and gas facilities are systematically reviewed per OSHA PSM 29 CFR 1910.119(l) MOC requirements.

  • Industry: Oil & Gas / Energy
  • Frequency: Per Change / Monthly MOC Backlog Review
  • Estimated Time: 20-30 minutes
  • Role: Process Engineer / PSM Coordinator
  • Total Items: 31
  • Compliance: OSHA 29 CFR 1910.119(l) - Management of Change, EPA 40 CFR Part 68.75 - Risk Management Program MOC Requirements, API RP 750 - Management of Process Hazards, CCPS Guidelines for the Management of Change for Process Safety

Change Description and Classification

Verify change is properly described and classified.

  • Change confirmed as NOT replacement-in-kind (requires MOC review)?
  • Technical basis for the change documented?
  • Change type categorized (process, equipment, procedure, temporary, organizational)?
  • If temporary change, expiration date and extension process defined?
  • Scope of change clearly defined to prevent scope creep?

Hazard Review

Ensure hazards of the change are evaluated.

  • Hazard review appropriate to change complexity conducted?
  • PHA triggered if change modifies process covered by PSM?
  • Any new or increased hazards identified and controls documented?
  • Impact on existing safeguards and safety systems evaluated?
  • Change approved by required authority level for risk level?

Documentation Updates

Verify documentation updates are planned.

  • P&ID and process flow diagram updates identified and scheduled?
  • Operating, maintenance, and emergency procedures updated or scheduled?
  • Equipment specifications, data sheets updated per change?
  • Process Safety Information (PSI) updated per 1910.119(d)?
  • Pressure relief device adequacy reviewed if process conditions change?

Training and Communication

Plan training for the change.

  • All affected personnel identified for change communication and training?
  • Training planned before startup for all affected operators and maintenance?
  • Training records to be maintained for all trained personnel?
  • Contractors working in affected area informed of change?
  • Change communication plan covering all shifts and rotations?

Pre-Startup Safety Review (PSSR)

Verify PSSR is planned.

  • PSSR required per OSHA 1910.119(i) before startup?
  • PSSR checklist prepared for the change?
  • PSSR team with required expertise assigned?
  • Process for tracking PSSR open items before startup defined?
  • PSSR sign-off required before operating on new or modified equipment?

MOC Closeout

Verify MOC is properly closed.

  • All MOC required actions completed before closeout?
  • All documentation updates confirmed completed?
  • Training completion verified for all required personnel?
  • Temporary change expiration or extension processed?
  • Completed MOC package filed in PSM documentation system?
  • Lessons learned captured and shared if applicable?

Related Oil Gas Energy Checklists

Related Process Safety Checklists

Why Use This Oil and Gas Management of Change (MOC) Review Checklist?

This oil and gas management of change (moc) review checklist helps oil & gas / energy teams maintain compliance and operational excellence. Designed for process engineer / psm coordinator professionals, this checklist covers 31 critical inspection points across 6 sections. Recommended frequency: per change / monthly moc backlog review.

Ensures compliance with OSHA 29 CFR 1910.119(l) - Management of Change, EPA 40 CFR Part 68.75 - Risk Management Program MOC Requirements, API RP 750 - Management of Process Hazards, CCPS Guidelines for the Management of Change for Process Safety. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Oil and Gas Management of Change (MOC) Review Checklist cover?

This checklist covers 31 inspection items across 6 sections: Change Description and Classification, Hazard Review, Documentation Updates, Training and Communication, Pre-Startup Safety Review (PSSR), MOC Closeout. It is designed for oil & gas / energy operations and compliance.

How often should this checklist be completed?

This checklist should be completed per change / monthly moc backlog review. Each completion takes approximately 20-30 minutes.

Who should use this Oil and Gas Management of Change (MOC) Review Checklist?

This checklist is designed for Process Engineer / PSM Coordinator professionals in the oil & gas / energy industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists