Engineering Change Management Checklist [FREE PDF]

Change management boards and quality engineers use this checklist per ISO 9001:2015 Clause 8.5.6 control of changes and IATF 16949 production change management requirements.

  • Industry: Manufacturing / Automotive
  • Frequency: Per Event
  • Estimated Time: 15-20 minutes
  • Role: Change Management Coordinator
  • Total Items: 8
  • Compliance: ISO 9001:2015 Clause 8.5.6, IATF 16949

Change Request & Impact Evaluation

Verify change request documentation and impact assessment.

  • Is the change request documented with clear description of what is changing and why?
  • Has an impact assessment been completed covering quality, safety, and regulatory effects?
  • Has customer notification/approval been obtained if required?
  • Change evaluation notes

Implementation & Verification

Verify change implementation and post-change validation.

  • Have all affected documents (drawings, specs, procedures) been updated?
  • Has the change been validated with first article or trial run inspection?
  • Have affected personnel been trained on the change before production resumes?
  • Implementation notes

Related Quality Management Checklists

Related Compliance Checklists

Why Use This Engineering Change Management Checklist [FREE PDF]?

This engineering change management checklist [free pdf] helps manufacturing / automotive teams maintain compliance and operational excellence. Designed for change management coordinator professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: per event.

Ensures compliance with ISO 9001:2015 Clause 8.5.6, IATF 16949. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Engineering Change Management Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Change Request & Impact Evaluation, Implementation & Verification. It is designed for manufacturing / automotive operations and compliance.

How often should this checklist be completed?

This checklist should be completed per event. Each completion takes approximately 15-20 minutes.

Who should use this Engineering Change Management Checklist [FREE PDF]?

This checklist is designed for Change Management Coordinator professionals in the manufacturing / automotive industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists