Geothermal Steam Separator and Brine System Checklist

This geothermal steam separator and brine system checklist ensures compliance with ASME Boiler and Pressure Vessel Code Section VIII for steam separators and flash vessels, OSHA 29 CFR 1910.119 Process Safety Management for high-temperature geothermal steam and H2S systems, API 510 Pressure Vessel Inspection Code, NACE International corrosion standards for geothermal service, and EPA H2S reporting requirements. Designed for geothermal operators to verify safety and integrity of wellfield steam g

  • Industry: Renewable Energy
  • Frequency: Weekly
  • Estimated Time: 1-2 hours
  • Role: Geothermal Plant Operator / Process Engineer
  • Total Items: 30
  • Compliance: ASME BPVC Section VIII Pressure Vessel Code, OSHA 29 CFR 1910.119 Process Safety Management, API 510 Pressure Vessel Inspection Code, NACE SP0407 Corrosion Control in Geothermal Systems, EPA 40 CFR Part 63 H2S Reporting Requirements

Steam Separator Operations

Flash steam separator performance.

  • Separator operating pressure within design limits?
  • Liquid level in separator within normal range?
  • Steam quality adequate (no excessive moisture carryover)?
  • Brine discharge flow from separator normal?
  • Separator Condition Photo

Pressure Vessel Safety

ASME and API 510 pressure vessel compliance.

  • Pressure relief valves operational and not gagged?
  • PRV test date current per API 510 inspection schedule?
  • All pressure gauges in calibration and reading correctly?
  • ASME nameplate visible and vessel inspection current?
  • No corrosion, pitting, or mechanical damage visible on vessel exterior?

Brine Handling System

Brine pipeline and reinjection system.

  • Brine pipeline free of scaling or plugging (pressure drop normal)?
  • No brine leaks from pipeline or fittings?
  • Scale inhibitor injection system dosing correctly?
  • Brine temperature not below silica scaling threshold?
  • No brine surface spills or discharges to environment?

Corrosion Monitoring

System corrosion inspection per NACE.

  • Corrosion coupons pulled and analyzed per schedule?
  • Corrosion rates within acceptable limits (NACE standards)?
  • Cathodic protection on buried brine piping active?
  • High-corrosion areas (elbows, valve bodies) inspected by UT?
  • Material upgrade recommendations from last corrosion survey implemented?

Non-Condensable Gas Management

H2S and CO2 gas handling.

  • NCG venting per permit (to abatement or controlled release)?
  • H2S monitoring at separator area within safe limits?
  • H2S emission monitoring records current for EPA reporting?
  • NCG compressor operational for gas reinjection or abatement?
  • Rock muffler ready for emergency steam discharge?

Shift Log

Separator and brine system documentation.

  • Shift log complete with separator parameters?
  • Any abnormal conditions (flash, slugging) documented?
  • Maintenance work orders created for findings?
  • H2S/emission reports filed per schedule?
  • Separator and Brine System Notes

Related Renewable Energy Checklists

Related Geothermal Checklists

Why Use This Geothermal Steam Separator and Brine System Checklist?

This geothermal steam separator and brine system checklist helps renewable energy teams maintain compliance and operational excellence. Designed for geothermal plant operator / process engineer professionals, this checklist covers 30 critical inspection points across 6 sections. Recommended frequency: weekly.

Ensures compliance with ASME BPVC Section VIII Pressure Vessel Code, OSHA 29 CFR 1910.119 Process Safety Management, API 510 Pressure Vessel Inspection Code, NACE SP0407 Corrosion Control in Geothermal Systems, EPA 40 CFR Part 63 H2S Reporting Requirements. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Geothermal Steam Separator and Brine System Checklist cover?

This checklist covers 30 inspection items across 6 sections: Steam Separator Operations, Pressure Vessel Safety, Brine Handling System, Corrosion Monitoring, Non-Condensable Gas Management, Shift Log. It is designed for renewable energy operations and compliance.

How often should this checklist be completed?

This checklist should be completed weekly. Each completion takes approximately 1-2 hours.

Who should use this Geothermal Steam Separator and Brine System Checklist?

This checklist is designed for Geothermal Plant Operator / Process Engineer professionals in the renewable energy industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.