Telecom Underground Utility Excavation Safety Checklist [FREE PDF]
This telecommunications underground utility excavation safety checklist ensures contractors locating, potholing, or directional drilling near buried telecom infrastructure comply with OSHA 1926 Subpart P, state 811 one-call requirements, and NESC requirements. Project managers use this to prevent cable strikes and worker injuries.
- Industry: Telecommunications
- Frequency: Per Event
- Estimated Time: 15-20 minutes
- Role: Construction Supervisor / Locate Technician
- Total Items: 8
- Compliance: OSHA 29 CFR 1926 Subpart P (excavations), State 811 one-call center requirements, NESC (National Electrical Safety Code) ANSI C2, APWA Uniform Color Code for utility marking
Utility Locate & Clearance
Verify utilities are located before excavation begins.
- 811 called at least 2-3 business days before excavation?
- All utilities marked with APWA color codes and markings valid?
- Critical crossings potholed (soft excavation) to confirm depth and location?
- Hand digging or vacuum excavation within tolerance zone (18-24 inches) of marked utilities?
Excavation Safety
Verify excavation safety measures.
- Trench protection (shoring, sloping, benching) in place for trenches over 5 feet?
- Egress ladders within 25 feet for all workers in trenches over 4 feet?
- Atmospheric testing performed in trenches potentially exposed to hazardous atmospheres?
- Excavation safety notes
Related Telecommunications Checklists
- 5G Small Cell Deployment Compliance Checklist [FREE PDF]
- Cable Television Headend & Plant Inspection Checklist [FREE PDF]
- Cell Tower Inspection Checklist - FREE PDF
- Fiber Optic Cable Inspection - FREE PDF
Why Use This Telecom Underground Utility Excavation Safety Checklist [FREE PDF]?
This telecom underground utility excavation safety checklist [free pdf] helps telecommunications teams maintain compliance and operational excellence. Designed for construction supervisor / locate technician professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: per event.
Ensures compliance with OSHA 29 CFR 1926 Subpart P (excavations), State 811 one-call center requirements, NESC (National Electrical Safety Code) ANSI C2, APWA Uniform Color Code for utility marking. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Telecom Underground Utility Excavation Safety Checklist [FREE PDF] cover?
This checklist covers 8 inspection items across 2 sections: Utility Locate & Clearance, Excavation Safety. It is designed for telecommunications operations and compliance.
How often should this checklist be completed?
This checklist should be completed per event. Each completion takes approximately 15-20 minutes.
Who should use this Telecom Underground Utility Excavation Safety Checklist [FREE PDF]?
This checklist is designed for Construction Supervisor / Locate Technician professionals in the telecommunications industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.