Telecom Underground Utility Excavation Safety Checklist [FREE PDF]

This telecommunications underground utility excavation safety checklist ensures contractors locating, potholing, or directional drilling near buried telecom infrastructure comply with OSHA 1926 Subpart P, state 811 one-call requirements, and NESC requirements. Project managers use this to prevent cable strikes and worker injuries.

  • Industry: Telecommunications
  • Frequency: Per Event
  • Estimated Time: 15-20 minutes
  • Role: Construction Supervisor / Locate Technician
  • Total Items: 8
  • Compliance: OSHA 29 CFR 1926 Subpart P (excavations), State 811 one-call center requirements, NESC (National Electrical Safety Code) ANSI C2, APWA Uniform Color Code for utility marking

Utility Locate & Clearance

Verify utilities are located before excavation begins.

  • 811 called at least 2-3 business days before excavation?
  • All utilities marked with APWA color codes and markings valid?
  • Critical crossings potholed (soft excavation) to confirm depth and location?
  • Hand digging or vacuum excavation within tolerance zone (18-24 inches) of marked utilities?

Excavation Safety

Verify excavation safety measures.

  • Trench protection (shoring, sloping, benching) in place for trenches over 5 feet?
  • Egress ladders within 25 feet for all workers in trenches over 4 feet?
  • Atmospheric testing performed in trenches potentially exposed to hazardous atmospheres?
  • Excavation safety notes

Related Telecommunications Checklists

Why Use This Telecom Underground Utility Excavation Safety Checklist [FREE PDF]?

This telecom underground utility excavation safety checklist [free pdf] helps telecommunications teams maintain compliance and operational excellence. Designed for construction supervisor / locate technician professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: per event.

Ensures compliance with OSHA 29 CFR 1926 Subpart P (excavations), State 811 one-call center requirements, NESC (National Electrical Safety Code) ANSI C2, APWA Uniform Color Code for utility marking. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Telecom Underground Utility Excavation Safety Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Utility Locate & Clearance, Excavation Safety. It is designed for telecommunications operations and compliance.

How often should this checklist be completed?

This checklist should be completed per event. Each completion takes approximately 15-20 minutes.

Who should use this Telecom Underground Utility Excavation Safety Checklist [FREE PDF]?

This checklist is designed for Construction Supervisor / Locate Technician professionals in the telecommunications industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists