CDM Regulations 2015 Pre-Construction Phase Principal Designer Audit

This checklist covers compliance with Construction (Design and Management) Regulations 2015 (CDM 2015) and applicable UK statutory requirements for construction operations. Non-compliance can result in unlimited fines and up to two years imprisonment under CDM Regulations 2015 and HSWA 1974 Section 33.

  • Industry: Construction
  • Frequency: Quarterly
  • Estimated Time: 20-30 minutes
  • Role: Principal Designer
  • Total Items: 20
  • Compliance: Construction (Design and Management) Regulations 2015 (CDM 2015), Health and Safety at Work etc. Act 1974, BS EN 13374, Work at Height Regulations 2005

CDM 2015 Statutory Duties & Notification

Verify Principal Designer appointment, Construction Phase Plan, and HSE F10 notification per CDM 2015.

  • Is a Principal Designer appointed in writing for notifiable projects requiring F10 notification to HSE?
  • Is the Construction Phase Plan (CPP) prepared, suitable, and communicated to all workers?
  • Is an F10 HSE notification submitted (or confirmed not required for non-notifiable works)?
  • Attach photo of F10 notification, Construction Phase Plan, and Principal Designer appointment letter:

Pre-Construction Information, Welfare & Induction

Verify pre-construction surveys, welfare provision, and site induction compliance per CDM 2015.

  • Are pre-construction surveys (asbestos, ground investigation, services) completed before work starts?
  • Is a welfare provision plan in place providing toilets, washing facilities, rest area, and drinking water?
  • Is site induction conducted for all workers before they begin work on site?
  • Attach photo of pre-construction surveys, welfare facilities inspection, and site induction register:

Temporary Works, Scaffold & CDM File

Verify temporary works design, scaffold inspection, and CDM Health and Safety File compliance.

  • Are all temporary works (excavations, propping, falsework) designed, inspected, and certified?
  • Is the scaffold inspection register up to date (7-day intervals or after adverse weather)?
  • Overall CDM and site safety compliance assessment:
  • Attach photo of scaffold inspection tags, temporary works design, and CDM health and safety file:

H&S File, RIDDOR Reporting & Project Closeout

Verify H&S File compilation, RIDDOR incident reporting, and project closeout compliance per CDM 2015.

  • Is the Health and Safety File being compiled by the Principal Designer and ready for handover at project completion?
  • Is a record of RIDDOR-reportable incidents maintained and reportable incidents submitted to HSE online?
  • Number of RIDDOR-reportable incidents on this project to date:
  • Principal Contractor or Site Manager certification of inspection:

Corrective Actions & Inspector Sign-Off

Document all deficiencies and assign corrective actions. POPProbe auto-assigns these to team members, generates a signed PDF report instantly, and tracks compliance status across all locations. -> Start free, no credit card required

  • List all deficiencies identified in this inspection:
  • Overall compliance status?
  • Corrective actions assigned to (name and department):
  • Inspector digital signature and date:

Related Uk Construction Safety Checklists

Related Cdm Compliance Checklists

Why Use This CDM Regulations 2015 Pre-Construction Phase Principal Designer Audit?

This cdm regulations 2015 pre-construction phase principal designer audit helps construction teams maintain compliance and operational excellence. Designed for principal designer professionals, this checklist covers 20 critical inspection points across 5 sections. Recommended frequency: quarterly.

Ensures compliance with Construction (Design and Management) Regulations 2015 (CDM 2015), Health and Safety at Work etc. Act 1974, BS EN 13374, Work at Height Regulations 2005. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What is a CDM Regulations 2015 Pre-Construction Phase Principal Designer Audit?

A CDM Regulations 2015 Pre-Construction Phase Principal Designer Audit is a standardized inspection form used by principal designer to ensure consistent construction operations. It contains 27 inspection points organized into 5 sections. FREE PDF - CDM Regulations 2015 Pre-Construction Phase Principal Designer checklist for UK operations. Covers Construction (Design and Management) Regulations 2015 (CDM 2015) requirements. Download FREE template.

How often should I use this construction checklist?

This checklist is designed to be completed quarterly. Regular use ensures compliance with Construction (Design and Management) Regulations 2015 (CDM 2015) and Health and Safety at Work etc. Act 1974 and helps identify issues before they become problems.

Can I download this CDM Regulations 2015 Pre-Construction Phase Principal Designer Audit as a PDF?

Yes, you can download this checklist as a FREE PDF for printing or offline use. The checklist includes 27 fields across 5 sections and typically takes 20-30 minutes to complete.

What compliance standards does this checklist cover?

This checklist helps ensure compliance with Construction (Design and Management) Regulations 2015 (CDM 2015), Health and Safety at Work etc. Act 1974, BS EN 13374, Work at Height Regulations 2005. Following these standards protects your organization and ensures best practices.

How do I complete this construction inspection checklist?

Begin by completing the header fields for Site / Premises Name, Inspection Date, Inspector Name & Title, and Reference / Permit Number. Work through each of the 5 sections, marking items Yes or No as applicable. Add notes for any issues found. Finally, complete the footer fields and add your signature. The entire process takes approximately 20 to 30 minutes.

What are the key sections in this construction checklist?

This construction checklist is organized into 5 key sections: CDM 2015 Statutory Duties & Notification, Pre-Construction Information, Welfare & Induction, Temporary Works, Scaffold & CDM File, H&S File, RIDDOR Reporting & Project Closeout, Corrective Actions & Inspector Sign-Off. Each section contains specific inspection points that principal designer must verify. The structured layout ensures nothing is missed during construction inspections and makes the process efficient, typically taking 20-30 minutes to complete.

Who should use this CDM Regulations 2015 Pre-Construction Phase Principal Designer Audit?

This checklist is primarily designed for principal designer working in construction operations. However, it is also valuable for quality assurance teams, safety officers, compliance managers, and supervisors who need to verify that construction standards are being met. Organizations of all sizes can benefit from using this CDM Regulations 2015 Pre-Construction Phase Principal Designer Audit to maintain consistency and accountability.