Smart Meter Installation

Complete per install.

  • Industry: Utilities
  • Frequency: Per install
  • Estimated Time: 30-60 min
  • Role: Technician
  • Total Items: 28
  • Compliance: Company Standards

Install

Install.

  • Installed?

Initial Setup & Documentation

Complete initial documentation and preparation

  • Inspector / Assessor Name
  • Date
  • Location / Area
  • Inspection Type
  • Previous findings reviewed?

Safety & Compliance Verification

Verify all safety requirements are met

  • All safety protocols being followed?
  • Emergency exits clear and accessible?
  • First aid supplies available and stocked?
  • All hazards identified and controlled?
  • Required PPE being worn correctly?

Operational Standards Check

Verify operational standards and procedures are maintained

  • Standard operating procedures being followed?
  • All equipment in proper working condition?
  • Maintenance schedule current?
  • All staff training current and documented?

Quality Assessment

Evaluate quality standards and performance metrics

  • Quality standards met for all items checked?
  • Any deficiencies or non-conformances identified?
  • Root cause analysis completed for issues?
  • Continuous improvement opportunities identified?

Environment & Conditions

Verify environmental conditions meet requirements

  • Area clean and well-maintained?
  • Adequate lighting in all areas?
  • Ventilation adequate?
  • Required signage visible and current?

Final Documentation & Sign-Off

Complete all documentation and assign follow-up actions

  • All checklist items reviewed and completed?
  • Corrective actions documented and assigned?
  • Relevant stakeholders notified of findings?
  • Inspector Signature
  • Additional Notes

Related Utilities Checklists

Related Electrical Distribution Checklists

Why Use This Smart Meter Installation?

This smart meter installation helps utilities teams maintain compliance and operational excellence. Designed for technician professionals, this checklist covers 28 critical inspection points across 7 sections. Recommended frequency: per install.

Ensures compliance with Company Standards. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Smart Meter Installation cover?

This checklist covers 28 inspection items across 7 sections: Install, Initial Setup & Documentation, Safety & Compliance Verification, Operational Standards Check, Quality Assessment, Environment & Conditions, Final Documentation & Sign-Off. It is designed for utilities operations and compliance.

How often should this checklist be completed?

This checklist should be completed per install. Each completion takes approximately 30-60 min.

Who should use this Smart Meter Installation?

This checklist is designed for Technician professionals in the utilities industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists