Nuclear Power Plant Outage Readiness Safety Inspection Checklist

This checklist supports nuclear power plant outage readiness assessments per NRC 10 CFR Part 50 Safety Requirements, ALARA (As Low As Reasonably Achievable) radiation protection principles, INPO AP-928 Conduct of Operations standards, and OSHA 29 CFR 1910.1096 Ionizing Radiation standards. Designed for nuclear plant radiation protection managers and outage management teams.

  • Industry: Nuclear Power Generation
  • Frequency: Pre-outage readiness assessment
  • Estimated Time: 40-60 minutes
  • Role: Radiation Protection Manager / Outage Manager
  • Total Items: 20
  • Compliance: NRC 10 CFR Part 20 Standards for Protection Against Radiation, NRC 10 CFR Part 50 Domestic Licensing of Production and Utilization Facilities, OSHA 29 CFR 1910.1096 Ionizing Radiation, INPO AP-928 Conduct of Operations in the Nuclear Industry

Radiation Protection Program Readiness

ALARA and radiation protection readiness.

  • Electronic dosimeters (TLDs and EPDs) available for all outage workers?
  • ALARA analysis completed for all high-dose work packages?
  • Current area dose rate surveys completed and posted in work areas?
  • Stay times calculated and communicated for controlled radiation areas?

Contamination Control

Radiological contamination controls.

  • Radiological change areas and decon stations set up and stocked?
  • Step-off pads at all Radiological Controlled Area (RCA) boundaries?
  • Anti-contamination clothing (anti-c) issued and proper donning/doffing training complete?

Industrial Safety

Work planning and industrial safety for outage activities.

  • Work packages reviewed and approved per plant procedures?
  • Confined space entries in RCA area following both RP and CS procedures?
  • Critical lift plans approved for heavy lifts in containment or near reactor components?
  • Fall protection in place for all elevated work locations in plant?

Fire Protection

Plant fire protection compliance during outage.

  • Transient combustible controls in effect per fire protection program?
  • Fire watches established where fire detection is impaired by outage activities?
  • Hot work permits in effect for welding or torch cutting in plant?

Emergency Preparedness

Emergency planning and response readiness.

  • Emergency Operating Procedures (EOPs) current and operators trained?
  • Plant communication systems and emergency notification tested?
  • Emergency assembly areas established for expanded outage workforce?

Outage Documentation

Outage plan and records.

  • Outage schedule and critical path documented and distributed?
  • Outage contractor/vendor qualifications verified per 10 CFR 50 Appendix B?
  • Readiness gaps or concerns identified

Related Utilities Checklists

Why Use This Nuclear Power Plant Outage Readiness Safety Inspection Checklist?

This nuclear power plant outage readiness safety inspection checklist helps nuclear power generation teams maintain compliance and operational excellence. Designed for radiation protection manager / outage manager professionals, this checklist covers 20 critical inspection points across 6 sections. Recommended frequency: pre-outage readiness assessment.

Ensures compliance with NRC 10 CFR Part 20 Standards for Protection Against Radiation, NRC 10 CFR Part 50 Domestic Licensing of Production and Utilization Facilities, OSHA 29 CFR 1910.1096 Ionizing Radiation, INPO AP-928 Conduct of Operations in the Nuclear Industry. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Nuclear Power Plant Outage Readiness Safety Inspection Checklist cover?

This checklist covers 20 inspection items across 6 sections: Radiation Protection Program Readiness, Contamination Control, Industrial Safety, Fire Protection, Emergency Preparedness, Outage Documentation. It is designed for nuclear power generation operations and compliance.

How often should this checklist be completed?

This checklist should be completed pre-outage readiness assessment. Each completion takes approximately 40-60 minutes.

Who should use this Nuclear Power Plant Outage Readiness Safety Inspection Checklist?

This checklist is designed for Radiation Protection Manager / Outage Manager professionals in the nuclear power generation industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists