Colombia Water Treatment Plant Checklist
Comprehensive Colombia water treatment plant checklist covering water quality and Min Salud Resolución 2115 requirements.
- Industry: Utilities
- Frequency: Daily
- Estimated Time: 40-50 minutes
- Role: Operador de Planta/Ingeniero Sanitario
- Total Items: 32
- Compliance: Resolución 2115 de 2007, Decreto 1575 de 2007, Min Salud
Captación
Intake
- ¿Bocatoma limpia?
- ¿Caudal de captación medido?
Tratamiento
Treatment
- ¿Coagulación-floculación correcta?
- ¿Sedimentadores funcionales?
- ¿Filtración correcta?
Desinfección
Disinfection
- ¿Cloración correcta?
- ¿Cloro residual en rango (0.3-2.0 mg/L)?
Calidad del Agua
Water quality
- ¿Turbiedad <2 UNT?
- ¿pH entre 6.5 y 9.0?
- ¿Análisis microbiológico al día?
Initial Setup & Documentation
Complete initial documentation and preparation
- Inspector / Assessor Name
- Date
- Location / Area
- Inspection Type
- Previous findings reviewed?
Safety & Compliance Verification
Verify all safety requirements are met
- All safety protocols being followed?
- Emergency exits clear and accessible?
- First aid supplies available and stocked?
- All hazards identified and controlled?
- Required PPE being worn correctly?
Operational Standards Check
Verify operational standards and procedures are maintained
- Standard operating procedures being followed?
- All equipment in proper working condition?
- Maintenance schedule current?
- All staff training current and documented?
Quality Assessment
Evaluate quality standards and performance metrics
- Quality standards met for all items checked?
- Any deficiencies or non-conformances identified?
- Root cause analysis completed for issues?
- Continuous improvement opportunities identified?
Environment & Conditions
Verify environmental conditions meet requirements
- Area clean and well-maintained?
- Adequate lighting in all areas?
- Ventilation adequate?
- Required signage visible and current?
Related Utilities Checklists
- Water Quality Testing
- Chlorine Monitoring
- Pump Station Inspection
- Electric Vehicle Charging Station Safety Inspection Checklist
- Hydroelectric Dam and Powerhouse Safety Inspection Checklist
- Wind Turbine Maintenance and Safety Inspection Checklist
- Hydroelectric Dam and Penstock Safety Inspection Checklist
Related Water Treatment Checklists
- Water Quality Testing - FREE Download
- Chlorine Monitoring - FREE Download
- Pump Station Inspection - FREE Download
Why Use This Colombia Water Treatment Plant Checklist?
This colombia water treatment plant checklist helps utilities teams maintain compliance and operational excellence. Designed for operador de planta/ingeniero sanitario professionals, this checklist covers 32 critical inspection points across 9 sections. Recommended frequency: daily.
Ensures compliance with Resolución 2115 de 2007, Decreto 1575 de 2007, Min Salud. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Colombia Water Treatment Plant Checklist cover?
This checklist covers 32 inspection items across 9 sections: Captación, Tratamiento, Desinfección, Calidad del Agua, Initial Setup & Documentation, Safety & Compliance Verification, Operational Standards Check, Quality Assessment, Environment & Conditions. It is designed for utilities operations and compliance.
How often should this checklist be completed?
This checklist should be completed daily. Each completion takes approximately 40-50 minutes.
Who should use this Colombia Water Treatment Plant Checklist?
This checklist is designed for Operador de Planta/Ingeniero Sanitario professionals in the utilities industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.