Industrial Wastewater Treatment Plant Operations Compliance Checklist

Industrial wastewater treatment plants must meet NPDES discharge limits and pretreatment standards. This daily compliance checklist ensures treatment processes are functioning correctly and permit limits are being met.

  • Industry: Waste Management
  • Frequency: Daily
  • Estimated Time: 30-40 minutes
  • Role: Wastewater Treatment Operator
  • Total Items: 36

Influent Monitoring

Verify influent flow and characteristics.

  • Influent flow rate measured and within expected range?
  • No unusual influent characteristics (color, odor, turbidity changes)?
  • Influent pH within treatment system operating range?
  • Industrial user discharges within pretreatment permit limits?
  • Slug load or upset notification received from industrial users?
  • Composite influent samples collected per NPDES monitoring schedule?

Treatment Unit Operations

Verify treatment process units are functioning.

  • Primary treatment (screening, sedimentation) operating normally?
  • Biological treatment system operating at normal parameters?
  • Dissolved oxygen in biological treatment within target range?
  • Return activated sludge (RAS) rate within design parameters?
  • Final clarifiers producing clear effluent - no sludge carryover?
  • Disinfection system (chlorination, UV) operational per design?

Effluent Compliance Monitoring

Monitor effluent to verify permit compliance.

  • Effluent composite samples collected per NPDES monitoring schedule?
  • Effluent parameters within daily maximum permit limits?
  • Effluent pH within permit range?
  • Effluent turbidity or TSS within permit limits?
  • Any permit exceedance reported to NPDES authority within required timeframe?
  • Monthly Discharge Monitoring Reports current and submitted on time?

Confined Space Safety

Verify confined space safety for tank and manhole entry.

  • Permit-required confined space program in place for tanks and manholes?
  • Atmospheric testing (O2, LEL, H2S) before any confined space entry?
  • Continuous gas monitoring during confined space entry?
  • Entry attendant at entrance during all confined space entries?
  • Rescue equipment and non-entry rescue procedure available?
  • Confined space entry permit log current?

Sludge Management

Manage biosolids per 40 CFR Part 503.

  • Sludge production logged daily?
  • Dewatering equipment operating efficiently?
  • Biosolids testing for metals and pathogens per 40 CFR 503 schedule?
  • Biosolids meeting Class A or Class B pathogen reduction requirements?
  • Biosolids disposal method (land application, landfill, incineration) documented?
  • Land application records including site, application rate, and dates maintained?

Documentation

Maintain required wastewater treatment documentation.

  • Daily operating log complete for all shift parameters?
  • Laboratory results entered and reviewed for permit compliance?
  • Equipment maintenance log current?
  • Upset events documented with cause, duration, and corrective action?
  • Operator certification current for plant classification?
  • Records organized and accessible for state or EPA inspection?

Related Waste Management Checklists

Related Collection Operations Checklists

Why Use This Industrial Wastewater Treatment Plant Operations Compliance Checklist?

This industrial wastewater treatment plant operations compliance checklist helps waste management teams maintain compliance and operational excellence. Designed for wastewater treatment operator professionals, this checklist covers 36 critical inspection points across 6 sections. Recommended frequency: daily.

Frequently Asked Questions

What does the Industrial Wastewater Treatment Plant Operations Compliance Checklist cover?

This checklist covers 36 inspection items across 6 sections: Influent Monitoring, Treatment Unit Operations, Effluent Compliance Monitoring, Confined Space Safety, Sludge Management, Documentation. It is designed for waste management operations and compliance.

How often should this checklist be completed?

This checklist should be completed daily. Each completion takes approximately 30-40 minutes.

Who should use this Industrial Wastewater Treatment Plant Operations Compliance Checklist?

This checklist is designed for Wastewater Treatment Operator professionals in the waste management industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists