Pre-Startup Safety Review (PSSR) - FREE PDF
Conduct Pre-Startup Safety Review before commissioning new/modified equipment.
- Industry: Manufacturing
- Frequency: Each startup
- Estimated Time: 2-8 hours
- Role: Operations / Engineering / Safety
- Total Items: 30
- Compliance: OSHA 1910.119(i), EPA RMP
Pre-Inspection Setup
Verify conditions before proceeding.
- Proper authorization obtained?
- Required documentation available?
- Safety precautions in place?
Inspection Items
Detailed inspection per OSHA 1910.119(i).
- Overall condition acceptable?
- Regulatory compliance verified?
- Safety features functional?
- Documentation current?
Deficiencies & Corrective Actions
Document findings and required actions.
- Inspection Result
- Deficiencies Description
- Corrective Actions Required
- Follow-up Date
- Inspector Signature
Initial Setup & Documentation
Complete initial documentation and preparation
- Inspector / Assessor Name
- Date
- Location / Area
- Inspection Type
- Previous findings reviewed?
Safety & Compliance Verification
Verify all safety requirements are met
- All safety protocols being followed?
- Emergency exits clear and accessible?
- First aid supplies available and stocked?
- All hazards identified and controlled?
- Required PPE being worn correctly?
Operational Standards Check
Verify operational standards and procedures are maintained
- Standard operating procedures being followed?
- All equipment in proper working condition?
- Maintenance schedule current?
- All staff training current and documented?
Quality Assessment
Evaluate quality standards and performance metrics
- Quality standards met for all items checked?
- Any deficiencies or non-conformances identified?
- Root cause analysis completed for issues?
- Continuous improvement opportunities identified?
Related Chemical Safety Checklists
- Process Safety Management MOC Review Checklist [FREE PDF]
- Process Safety Management (PSM) Audit - FREE PDF
- Management of Change (MOC) Checklist - FREE PDF
- Chemical Storage (Paint & Solvents) Checklist
- Spill Response (Plant) Checklist
- Fuel Storage & Dispensing Safety Checklist
- Spill Prevention & Response (Mine) Checklist
Related Process Safety Checklists
- Process Safety Management (PSM) Audit - FREE PDF - FREE Download
- Management of Change (MOC) Checklist - FREE PDF - FREE Download
- Process Safety Management MOC Review Checklist [FREE PDF] - FREE Download
Why Use This Pre-Startup Safety Review (PSSR)?
This pre-startup safety review (pssr) helps manufacturing teams maintain compliance and operational excellence. Designed for operations / engineering / safety professionals, this checklist covers 30 critical inspection points across 7 sections. Recommended frequency: each startup.
Ensures compliance with OSHA 1910.119(i), EPA RMP. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Pre-Startup Safety Review (PSSR) cover?
This checklist covers 30 inspection items across 7 sections: Pre-Inspection Setup, Inspection Items, Deficiencies & Corrective Actions, Initial Setup & Documentation, Safety & Compliance Verification, Operational Standards Check, Quality Assessment. It is designed for manufacturing operations and compliance.
How often should this checklist be completed?
This checklist should be completed each startup. Each completion takes approximately 2-8 hours.
Who should use this Pre-Startup Safety Review (PSSR)?
This checklist is designed for Operations / Engineering / Safety professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.