Childcare Environmental Health Hazard Identification and Remediation
Young children are particularly vulnerable to environmental health hazards due to their developmental stage and behavioral patterns. This inspection identifies lead, mold, radon, and other environmental health risks in childcare facilities and guides appropriate remediation.
- Industry: Childcare and Education
- Frequency: Annually and after any water damage or renovation
- Estimated Time: 3-4 hours
- Role: Center Director / Environmental Health Consultant
- Total Items: 30
Lead Hazard Assessment
Assess lead paint and pipe hazards.
- Building constructed before 1978 when lead paint was common?
- Any deteriorating, peeling, or chipping paint on walls, windows, doors, or trim?
- Lead paint test completed by certified inspector if applicable?
- Drinking water tested for lead contamination?
- Plumbing age and material assessed for lead pipe risk?
Mold and Moisture Assessment
Identify mold and moisture issues.
- No visible mold growth on walls, ceilings, floors, or surfaces?
- No musty or mold odors in any area?
- No water stains on ceiling tiles, walls, or floor indicating past water intrusion?
- No excessive condensation around HVAC units or vents?
- Bathrooms, kitchen areas, and sinks inspected for mold or mildew?
Radon Testing
Assess radon levels per EPA guidelines.
- Radon test conducted in past 2 years per EPA recommendation?
- Radon levels below 4 pCi/L EPA action level?
- Radon mitigation system installed and functional if levels were elevated?
- Retesting completed after mitigation to verify effectiveness?
- Next radon test scheduled within recommended interval?
Indoor Air Quality
Assess indoor air quality.
- HVAC system maintained with current filter replacement?
- Adequate ventilation in all occupied spaces?
- No strong chemical odors from cleaning products or building materials?
- Carbon monoxide detectors functional?
- Smoking prohibited in and around facility?
Water Safety
Verify drinking water safety.
- Drinking water tested and confirmed potable?
- Water filters installed at drinking water sources if lead risk identified?
- Hot water at child handwashing sinks below 120 degrees Fahrenheit to prevent scalding?
- Backflow prevention devices on hose bibs and utility connections?
- Annual water quality testing scheduled?
Integrated Pest Management
Verify safe pest management practices.
- No evidence of pest activity?
- Integrated Pest Management (IPM) program using least-toxic methods?
- Families notified before any pesticide application?
- Pest entry points sealed?
- Food stored in pest-proof containers?
Related Childcare Education Checklists
- Childcare Aquatic and Water Safety Inspection
- Childcare Behavioral Guidance and Positive Discipline Compliance
- Childcare Stranger Safety and Child Protection Awareness Program
- Child Protection and Abuse Prevention Policy Compliance Check
- Childcare Center Menu Planning and CACFP Compliance Review
- After-School Program Enrollment and Registration Compliance
- Childcare Center Vendor and Visitor Safety Screening
- Infant Room Daily Environment and Safety Check
Related Child Safety Checklists
- Child Protection and Abuse Prevention Policy Compliance Check - FREE Download
- Childcare Staff Background Check Compliance Audit - FREE Download
- Childcare Mandated Reporter Compliance Checklist - FREE Download
- Childcare Lockdown and Shelter-in-Place Drill Protocol - FREE Download
- Childcare Facility Alleged Abuse or Neglect Response Protocol - FREE Download
- Childcare Stranger Safety and Authorized Pickup Security Protocol - FREE Download
- Childcare Emergency Supply Kit and Go-Bag Inspection - FREE Download
- Childcare Mandatory Child Abuse Reporting Compliance Protocol - FREE Download
- Childcare Aquatic and Water Safety Inspection - FREE Download
- Childcare Behavioral Guidance and Positive Discipline Compliance - FREE Download
Why Use This Childcare Environmental Health Hazard Identification and Remediation?
This childcare environmental health hazard identification and remediation helps childcare and education teams maintain compliance and operational excellence. Designed for center director / environmental health consultant professionals, this checklist covers 30 critical inspection points across 6 sections. Recommended frequency: annually and after any water damage or renovation.
Frequently Asked Questions
What does the Childcare Environmental Health Hazard Identification and Remediation cover?
This checklist covers 30 inspection items across 6 sections: Lead Hazard Assessment, Mold and Moisture Assessment, Radon Testing, Indoor Air Quality, Water Safety, Integrated Pest Management. It is designed for childcare and education operations and compliance.
How often should this checklist be completed?
This checklist should be completed annually and after any water damage or renovation. Each completion takes approximately 3-4 hours.
Who should use this Childcare Environmental Health Hazard Identification and Remediation?
This checklist is designed for Center Director / Environmental Health Consultant professionals in the childcare and education industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.