OSHA 29 CFR 1926.753 Hoisting & Rigging in Steel Erection
This checklist covers OSHA 29 CFR 1926.753 Hoisting & Rigging in Steel Erection requirements under applicable federal and industry regulations. Violations may result in civil penalties up to $15,625 per violation per day and potential operational suspension.
- Industry: Construction
- Frequency: Quarterly
- Estimated Time: 20-30 minutes
- Role: Rigging Supervisor
- Total Items: 20
- Compliance: OSHA General Duty Clause, 29 CFR 1910, Industry Best Practices
Regulatory Documentation & Compliance Status
Verify current regulatory compliance status and required documentation is in order.
- Are all applicable permits, licenses, and registrations current and posted?
- Has required training been completed and documented for all personnel assigned to this area?
- Are all required safety signs, labels, and warnings in place and legible?
- Attach photo of permit postings and safety signage:
Safety Equipment & Inspection Records
Verify safety equipment condition and inspection record currency.
- Are all required safety inspections current and documented?
- Is personal protective equipment available, maintained, and used correctly?
- Number of open deficiencies from previous inspection:
- Attach photo of safety equipment and inspection records:
Work Practices & Housekeeping
Evaluate worker compliance with safe work practices and housekeeping standards.
- Are workers following established safe work procedures and using required PPE?
- Is housekeeping adequate with no trip hazards, blocked egress, or unsecured materials?
- Work area safety and housekeeping assessment:
- Attach photo of work area conditions and housekeeping:
Previous Findings Review & Supervisor Certification
Review prior findings and obtain supervisor acknowledgment of current inspection.
- Have all findings from previous inspections been corrected and verified effective?
- Is supervision aware of all current compliance issues and engaged in resolution?
- Total corrective actions assigned from this inspection:
- Responsible supervisor or area lead certification of inspection:
Corrective Actions & Inspector Sign-Off
Document all deficiencies and assign corrective actions. POPProbe auto-assigns these to team members, generates a signed PDF report instantly, and tracks compliance status across all locations. -> Start free, no credit card required
- List all deficiencies identified in this inspection:
- Overall compliance status?
- Corrective actions assigned to (name and department):
- Inspector digital signature and date:
Related Construction Checklists
- Gas Safety (Installation & Use) Regulations 1998 Compliance Audit
- Gas Safety Regulations 1998 Annual CP12 Landlord Gas Safety Record
- Power Tool Safety Inspection
- Pneumatic Tool Inspection
- ANSI/AISC Steel Structure Inspection Checklist
- OSHA 29 CFR 1926 Subpart G Signs Signals & Barricades Checklist
- OSHA 29 CFR 1926.502 Safety Net System Inspection Checklist
- OSHA 29 CFR 1926.352 Fire Prevention in Welding & Cutting
Related Equipment Maintenance Checklists
- Power Tool Safety Inspection - FREE Download
- Pneumatic Tool Inspection - FREE Download
- Abrasive Wheel Inspection - FREE Download
- Chain Saw Safety Checklist - FREE Download
- Aerial Lift Daily Inspection - FREE Download
- Boom Lift Pre-Operation - FREE Download
- Scissor Lift Daily Check - FREE Download
- Crane Lift Plan Checklist - FREE Download
- Tower Crane Daily Inspection - FREE Download
- Mobile Crane Annual Inspection - FREE Download
Why Use This OSHA 29 CFR 1926.753 Hoisting & Rigging in Steel Erection?
This osha 29 cfr 1926.753 hoisting & rigging in steel erection helps construction teams maintain compliance and operational excellence. Designed for rigging supervisor professionals, this checklist covers 20 critical inspection points across 5 sections. Recommended frequency: quarterly.
Ensures compliance with OSHA General Duty Clause, 29 CFR 1910, Industry Best Practices. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the OSHA 29 CFR 1926.753 Hoisting & Rigging in Steel Erection cover?
This checklist covers 20 inspection items across 5 sections: Regulatory Documentation & Compliance Status, Safety Equipment & Inspection Records, Work Practices & Housekeeping, Previous Findings Review & Supervisor Certification, Corrective Actions & Inspector Sign-Off. It is designed for construction operations and compliance.
How often should this checklist be completed?
This checklist should be completed quarterly. Each completion takes approximately 20-30 minutes.
Who should use this OSHA 29 CFR 1926.753 Hoisting & Rigging in Steel Erection?
This checklist is designed for Rigging Supervisor professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.