Construction Temporary Shoring Inspection Checklist

Comprehensive temporary shoring system inspection checklist for excavation support.

  • Industry: Construction
  • Frequency: Daily
  • Estimated Time: 15-20 minutes
  • Role: Competent Person
  • Total Items: 22
  • Compliance: OSHA 1926.652, Structural Engineer Design, Local Building Codes

Design/Plans

Engineering

  • Shoring plans on site?
  • Installed per plans?

Structural Members

Shoring components

  • Soldier piles/sheet piles in good condition?
  • Walers secure and undamaged?
  • Struts/braces in place and tight?

Movement/Deflection

Stability monitoring

  • No excessive movement observed?
  • Monitoring points checked?

Drainage/Water

Water control

  • Dewatering adequate?
  • No erosion undermining shoring?

PPE Compliance

PPE inspection

  • Hard hats worn?
  • Safety glasses worn?
  • High-vis vests worn?
  • Steel-toe boots worn?

Fall Protection

OSHA 1926 Subpart M

  • Fall protection above 6 feet?
  • Guardrails intact?
  • Harnesses inspected?

Housekeeping & Organization

Site organization

  • Walkways clear?
  • Materials stored safely?
  • Debris removed?

Electrical Safety

OSHA 1926 Subpart K

  • GFCI protection on circuits?
  • Extension cords good?
  • Lockout/tagout followed?

Related Construction Checklists

Related Excavation Checklists

Why Use This Construction Temporary Shoring Inspection Checklist?

This construction temporary shoring inspection checklist helps construction teams maintain compliance and operational excellence. Designed for competent person professionals, this checklist covers 22 critical inspection points across 8 sections. Recommended frequency: daily.

Ensures compliance with OSHA 1926.652, Structural Engineer Design, Local Building Codes. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Construction Temporary Shoring Inspection Checklist cover?

This checklist covers 22 inspection items across 8 sections: Design/Plans, Structural Members, Movement/Deflection, Drainage/Water, PPE Compliance, Fall Protection, Housekeeping & Organization, Electrical Safety. It is designed for construction operations and compliance.

How often should this checklist be completed?

This checklist should be completed daily. Each completion takes approximately 15-20 minutes.

Who should use this Construction Temporary Shoring Inspection Checklist?

This checklist is designed for Competent Person professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists