Excavation & Trenching Safety Checklist
FREE excavation and trenching safety checklist with OSHA 1926 Subpart P compliance. Covers soil classification, protective systems, atmospheric testing, and cave-in prevention. Multi-market standards for US OSHA, UK CDM, India IS 3764, Brazil NR-18, Mexico NOM-031-STPS, and Colombia regulations. Download FREE PDF with 50+ inspection points.
- Industry: Construction
- Frequency: Daily Before Entry
- Estimated Time: 25-35 minutes
- Role: Operations Manager
- Total Items: 33
- Compliance: OSHA 29 CFR 1926 Subpart P (Excavations), OSHA 1926.651 (General Requirements), OSHA 1926.652 (Protective Systems), UK CDM Regulations 2015, UK BS 6031 (Earthworks)
Pre-Excavation Requirements
OSHA 1926.651(b) utility location and surface hazards.
- Underground utilities located and marked (811 call)?
- Minimum 18-inch hand dig zone around utilities?
- Adjacent structures assessed for stability?
- Traffic control in place for nearby vehicles?
- Surface water diverted away from excavation?
Protective Systems
OSHA 1926.652 cave-in protection requirements for excavations ≥5 feet.
- Cave-in protection in place for depths ≥5 feet?
- Type of protective system used?
- Sloping at correct angle for soil type?
- Shoring system meets tabulated data or engineered design?
- Trench shield rated for soil type and depth?
- Shield extends above bottom of excavation?
- Spoil pile minimum 2 feet from edge?
Access & Egress
OSHA 1926.651(c)(2) safe access requirements.
- Ladder, ramp, or stairway within 25 feet of workers?
- Ladder extends 3 feet above landing?
- Ladder secured to prevent displacement?
- Ramps designed for intended loads (if used)?
- Access points clear of obstructions?
Atmospheric Hazards
OSHA 1926.651(g) testing for hazardous atmospheres.
- Atmosphere tested before entry (if >4 feet)?
- Oxygen level between 19.5% and 23.5%?
- Combustible gas below 10% LEL?
- Hydrogen sulfide below 10 ppm?
- Ventilation provided if atmospheric hazards present?
- Emergency rescue equipment available?
Daily Inspection Points
Competent person daily inspection requirements.
- Soil conditions unchanged since last inspection?
- Excavation walls stable (no sloughing, bulging)?
- No water accumulation in excavation?
- Protective systems intact and functioning?
- Heavy equipment operating safely near edge?
- Barricades and warning signs in place?
PPE Compliance Verification
Personal protective equipment inspection
- Hard hats worn in required areas?
- Safety glasses/goggles worn as required?
- High-visibility vests worn?
- Steel-toe boots worn by all workers?
Related Construction Checklists
- Excavation Daily Inspection - FREE PDF
- Trench Box/Shoring Inspection - FREE PDF
- Soil Classification Checklist - FREE PDF
- Excavation Sloping/Benching Verification - FREE PDF
- Hot Work Permit & Safety Checklist
- Fall Protection Equipment Inspection Checklist
- Mobile Crane Lift Plan Checklist
- Aerial Lift Pre-Use Inspection Checklist
Related Excavation Checklists
- Excavation Daily Inspection - FREE PDF - FREE Download
- Trench Box/Shoring Inspection - FREE PDF - FREE Download
- Soil Classification Checklist - FREE PDF - FREE Download
- Excavation Sloping/Benching Verification - FREE PDF - FREE Download
- Excavation Work Permit - FREE PDF - FREE Download
- Excavation Confined Space Entry Permit - FREE PDF - FREE Download
- Underground Utility Protection Checklist - FREE PDF - FREE Download
- Excavation Daily Inspection Checklist - FREE PDF - FREE Download
- Soil Classification Documentation - FREE PDF - FREE Download
- Construction Excavation Competent Person Inspection Checklist - FREE Download