Drywall Inspection

Complete after hanging and after finishing.

  • Industry: Construction
  • Frequency: Per phase
  • Estimated Time: 45-60 minutes
  • Role: Quality Inspector / Superintendent
  • Total Items: 31
  • Compliance: GA-216, Project Specs

Hanging Inspection

Check board installation.

  • Correct board type used?
  • Fastener spacing correct?
  • Gaps minimal (1/8" max)?
  • Backing at all edges?

Finishing Inspection

Check finish quality.

  • Joints smooth and feathered?
  • Fastener heads covered?
  • Corners clean and straight?
  • Finish level meets specs?

Pre-Inspection Setup & Documentation

Initial documentation and site preparation verification

  • Inspector Name
  • Inspection Date
  • Project Name / Job Number
  • Current Weather Conditions
  • Previous inspection findings reviewed?

Safety & Compliance Verification

Verify compliance with applicable OSHA regulations and site safety plan

  • Site safety plan posted and accessible?
  • All required permits current and displayed?
  • SDS/MSDS sheets available for all chemicals on site?
  • First aid supplies accessible and stocked?
  • Emergency contact information posted?

Personal Protective Equipment (PPE)

Verify all personnel have and are using appropriate PPE

  • Hard hats worn by all personnel?
  • Safety glasses/eye protection in use?
  • High-visibility vests worn where required?
  • Steel-toe/safety footwear worn?
  • PPE in good condition (no damage)?

Site Conditions & Housekeeping

General site conditions and housekeeping standards

  • Walkways and access routes clear of debris?
  • Adequate lighting in all work areas?
  • Trip hazards identified and addressed?
  • Waste properly contained and removed?

Equipment & Tools Condition

Verify all equipment and tools are in safe working condition

  • All equipment pre-use inspected today?
  • Machine guards in place and functional?
  • Electrical cords and connections in good condition?
  • Any defective tools removed from service?

Related Construction Checklists

Related Quality Control Checklists

Why Use This Drywall Inspection?

This drywall inspection helps construction teams maintain compliance and operational excellence. Designed for quality inspector / superintendent professionals, this checklist covers 31 critical inspection points across 7 sections. Recommended frequency: per phase.

Ensures compliance with GA-216, Project Specs. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Drywall Inspection cover?

This checklist covers 31 inspection items across 7 sections: Hanging Inspection, Finishing Inspection, Pre-Inspection Setup & Documentation, Safety & Compliance Verification, Personal Protective Equipment (PPE), Site Conditions & Housekeeping, Equipment & Tools Condition. It is designed for construction operations and compliance.

How often should this checklist be completed?

This checklist should be completed per phase. Each completion takes approximately 45-60 minutes.

Who should use this Drywall Inspection?

This checklist is designed for Quality Inspector / Superintendent professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.