HVAC Installation Inspection

Complete during HVAC rough-in and final.

  • Industry: Construction
  • Frequency: Per phase
  • Estimated Time: 1-2 hours
  • Role: HVAC Inspector / Superintendent
  • Total Items: 33
  • Compliance: IMC, Local Mechanical Code, SMACNA

Ductwork

Check duct installation.

  • Duct sizes per plans?
  • Joints properly sealed?
  • Proper hangers/supports?
  • Insulation properly installed?

Equipment

Check equipment installation.

  • Equipment securely mounted?
  • Service access clearances met?
  • Electrical connections complete?
  • Condensate drain lines installed?

Controls

Check control systems.

  • Thermostat locations correct?
  • Control wiring complete?

Pre-Inspection Setup & Documentation

Initial documentation and site preparation verification

  • Inspector Name
  • Inspection Date
  • Project Name / Job Number
  • Current Weather Conditions
  • Previous inspection findings reviewed?

Safety & Compliance Verification

Verify compliance with applicable OSHA regulations and site safety plan

  • Site safety plan posted and accessible?
  • All required permits current and displayed?
  • SDS/MSDS sheets available for all chemicals on site?
  • First aid supplies accessible and stocked?
  • Emergency contact information posted?

Personal Protective Equipment (PPE)

Verify all personnel have and are using appropriate PPE

  • Hard hats worn by all personnel?
  • Safety glasses/eye protection in use?
  • High-visibility vests worn where required?
  • Steel-toe/safety footwear worn?
  • PPE in good condition (no damage)?

Site Conditions & Housekeeping

General site conditions and housekeeping standards

  • Walkways and access routes clear of debris?
  • Adequate lighting in all work areas?
  • Trip hazards identified and addressed?
  • Waste properly contained and removed?

Equipment & Tools Condition

Verify all equipment and tools are in safe working condition

  • All equipment pre-use inspected today?
  • Machine guards in place and functional?
  • Electrical cords and connections in good condition?
  • Any defective tools removed from service?