Electrical Safety Audit

Complete weekly or as required.

  • Industry: Construction
  • Frequency: Weekly
  • Estimated Time: 30-45 minutes
  • Role: Safety Officer / Electrician
  • Total Items: 30
  • Compliance: OSHA 1926 Subpart K, NFPA 70E

Temporary Power

Inspect temporary electrical.

  • All outlets GFCI protected?
  • GFCIs tested and working?
  • Extension cords properly rated?
  • Cords in good condition (no damage)?

Panels & Equipment

Inspect electrical panels.

  • Panel covers in place?
  • Required clearance maintained (36 inches)?
  • Equipment properly grounded?
  • Circuits and panels labeled?

Lockout/Tagout

Verify LOTO compliance.

  • LOTO program in place?
  • Locks and tags available?
  • Workers LOTO trained?

Pre-Inspection Setup & Documentation

Initial documentation and site preparation verification

  • Inspector Name
  • Inspection Date
  • Project Name / Job Number
  • Current Weather Conditions
  • Previous inspection findings reviewed?

Safety & Compliance Verification

Verify compliance with applicable OSHA regulations and site safety plan

  • Site safety plan posted and accessible?
  • All required permits current and displayed?
  • SDS/MSDS sheets available for all chemicals on site?
  • First aid supplies accessible and stocked?
  • Emergency contact information posted?

Personal Protective Equipment (PPE)

Verify all personnel have and are using appropriate PPE

  • Hard hats worn by all personnel?
  • Safety glasses/eye protection in use?
  • High-visibility vests worn where required?
  • Steel-toe/safety footwear worn?
  • PPE in good condition (no damage)?

Site Conditions & Housekeeping

General site conditions and housekeeping standards

  • Walkways and access routes clear of debris?
  • Adequate lighting in all work areas?
  • Trip hazards identified and addressed?
  • Waste properly contained and removed?

Related Construction Checklists

Related Safety Protocols Checklists

Browse More Checklists