Telecom Trenching & Utility Locate Checklist

This comprehensive telecom checklist supports compliance with OSHA 29 CFR 1910.268 (Telecommunications) and OSHA 29 CFR 1926 Subpart M (Fall Protection), helping field teams manage high-risk work safely. Designed for Construction Supervisor roles in Telecom Construction to document controls, evidence, and corrective actions.

  • Industry: Telecom Construction
  • Frequency: Daily
  • Estimated Time: 25-40 minutes
  • Role: Construction Supervisor
  • Total Items: 42
  • Compliance: OSHA 29 CFR 1910.268 (Telecommunications), OSHA 29 CFR 1926 Subpart M (Fall Protection), FCC RF Exposure Guidelines (OET Bulletin 65), ANSI/TIA-222 (Antenna Supporting Structures), NFPA 70 (NEC)

Site Access & Permits

Confirm access authorization, permits, and notifications are in place.

  • Access authorization obtained?
  • Permits (hot work, confined space) issued if required?
  • Utility locates completed where digging occurs?
  • Site hazards briefed in pre-job meeting?
  • Notes / observations
  • Photo evidence

Fall Protection & Tower Safety

Verify fall protection systems, rescue readiness, and safe climbing practices.

  • Harness/lanyards inspected and in date?
  • Anchorage points verified and rated?
  • Rescue plan and kit onsite?
  • 100% tie-off maintained during ascent/descent?
  • Notes / observations
  • Photo evidence

RF Exposure & Lockout

Control RF exposure and ensure lockout/tagout of transmitters when required.

  • RF hazard assessment completed?
  • Transmitters reduced/locked out per plan?
  • RF monitors/alarms functional?
  • Exclusion zones posted and respected?
  • Notes / observations
  • Photo evidence

Electrical & Power Systems

Inspect power, grounding, batteries, and generators for safe condition.

  • Lockout/tagout applied before work on energized parts?
  • Grounding/bonding intact and tested?
  • Battery rooms ventilated; spill controls present?
  • Generators fueled and maintained; exhaust safe?
  • Notes / observations
  • Photo evidence

Equipment Installation & Cabling

Verify mounting, cable management, labeling, and weatherproofing.

  • Equipment mounted per manufacturer torque/spec?
  • Cables dressed; bend radius maintained?
  • Connectors weatherproofed; drip loops present?
  • Labels match as-built documentation?
  • Notes / observations
  • Photo evidence

Housekeeping & Weather Readiness

Confirm housekeeping, tool control, and weather controls.

  • Tools accounted for; dropped object prevention used?
  • Housekeeping acceptable; trip hazards removed?
  • Lightning/wind thresholds monitored?
  • Site fencing/locks intact?
  • Notes / observations
  • Photo evidence

Corrective Actions & Stop Work

Document findings and apply stop-work for unsafe conditions.

  • Stop-work used for imminent danger?
  • Corrective actions assigned with owner and due date?
  • Photos captured for deficiencies?
  • Re-test/re-inspection scheduled?
  • Notes / observations
  • Photo evidence