Tornado Shelter & Storm Readiness Checklist [FREE PDF]

Facility managers and emergency coordinators use this checklist per FEMA P-361 safe room design guidance and OSHA severe weather preparedness requirements for tornado shelter readiness.

  • Industry: General / All Industries
  • Frequency: Annually / Before Storm Season
  • Estimated Time: 15-20 minutes
  • Role: Emergency Coordinator
  • Total Items: 8
  • Compliance: FEMA P-361, OSHA Emergency Preparedness

Shelter Condition & Capacity

Inspect designated shelter areas for readiness.

  • Are tornado shelter areas clearly identified with signage directing occupants?
  • Is the shelter capacity adequate for the building population (5 sq ft per person)?
  • Are emergency supplies (water, first aid, flashlights, weather radio) stocked in the shelter?
  • Shelter readiness notes

Notification & Drill Procedures

Verify notification systems and drill completion.

  • Is the severe weather alert system (NOAA radio, mass notification) operational and tested?
  • Has a tornado drill been conducted within the current storm season?
  • Do all employees know the tornado warning procedure and shelter location?
  • Notification and drill notes

Related Emergency Checklists

Related Emergency Preparedness Checklists

Why Use This Tornado Shelter & Storm Readiness Checklist [FREE PDF]?

This tornado shelter & storm readiness checklist [free pdf] helps general / all industries teams maintain compliance and operational excellence. Designed for emergency coordinator professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: annually / before storm season.

Ensures compliance with FEMA P-361, OSHA Emergency Preparedness. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Tornado Shelter & Storm Readiness Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Shelter Condition & Capacity, Notification & Drill Procedures. It is designed for general / all industries operations and compliance.

How often should this checklist be completed?

This checklist should be completed annually / before storm season. Each completion takes approximately 15-20 minutes.

Who should use this Tornado Shelter & Storm Readiness Checklist [FREE PDF]?

This checklist is designed for Emergency Coordinator professionals in the general / all industries industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists