Electric Substation Inspection Checklist [FREE PDF]

Substation technicians and utility inspectors use this checklist per NERC FAC standards for facility ratings and National Electrical Safety Code (NESC) substation safety requirements.

  • Industry: Utilities / Energy
  • Frequency: Monthly
  • Estimated Time: 20-25 minutes
  • Role: Substation Technician
  • Total Items: 8
  • Compliance: NERC FAC Standards, NESC C2

Equipment Condition & Visual Inspection

Inspect transformers, breakers, and switchgear.

  • Are power transformers free of oil leaks with gauges reading normal?
  • Are circuit breakers and disconnect switches in proper position per switching orders?
  • Are bushings and insulators clean and free of cracks, chips, or tracking marks?
  • Equipment condition notes

Security & Grounds

Inspect substation security and ground conditions.

  • Is the perimeter fence intact with no unauthorized access points?
  • Is the ground grid and equipment grounding system intact and connections tight?
  • Is vegetation cleared to maintain required clearances from energized equipment?
  • Security and grounds notes

Related Energy Utilities Checklists

Related Electrical Systems Checklists

Why Use This Electric Substation Inspection Checklist [FREE PDF]?

This electric substation inspection checklist [free pdf] helps utilities / energy teams maintain compliance and operational excellence. Designed for substation technician professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: monthly.

Ensures compliance with NERC FAC Standards, NESC C2. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Electric Substation Inspection Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Equipment Condition & Visual Inspection, Security & Grounds. It is designed for utilities / energy operations and compliance.

How often should this checklist be completed?

This checklist should be completed monthly. Each completion takes approximately 20-25 minutes.

Who should use this Electric Substation Inspection Checklist [FREE PDF]?

This checklist is designed for Substation Technician professionals in the utilities / energy industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists