Electrical Substation Safety Inspection Checklist [FREE PDF]

Utility engineers and substation technicians use this checklist to inspect electrical substation equipment per NFPA 70B recommended practice for electrical equipment maintenance and OSHA 1910.269 electric power generation requirements.

  • Industry: Energy & Utilities
  • Frequency: Quarterly
  • Estimated Time: 25-35 minutes
  • Role: Substation Technician
  • Total Items: 8
  • Compliance: NFPA 70B, OSHA 29 CFR 1910.269

Transformer & Switchgear

Inspect power transformers, circuit breakers, and switchgear condition.

  • Are transformers free of oil leaks, unusual noise, or overheating?
  • Are circuit breakers operational with trip counts within manufacturer limits?
  • Are insulating oil test results (dielectric, DGA) within acceptable limits?
  • Transformer and switchgear notes

Grounding Grid & Physical Security

Verify grounding system integrity and substation security measures.

  • Is the grounding grid intact with ground resistance within design limits?
  • Is the substation perimeter fencing intact with locked gates?
  • Are high-voltage warning signs posted at all entry points?
  • Grounding and security notes

Related Energy Utilities Checklists

Related Electrical Systems Checklists

Why Use This Electrical Substation Safety Inspection Checklist [FREE PDF]?

This electrical substation safety inspection checklist [free pdf] helps energy & utilities teams maintain compliance and operational excellence. Designed for substation technician professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: quarterly.

Ensures compliance with NFPA 70B, OSHA 29 CFR 1910.269. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Electrical Substation Safety Inspection Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Transformer & Switchgear, Grounding Grid & Physical Security. It is designed for energy & utilities operations and compliance.

How often should this checklist be completed?

This checklist should be completed quarterly. Each completion takes approximately 25-35 minutes.

Who should use this Electrical Substation Safety Inspection Checklist [FREE PDF]?

This checklist is designed for Substation Technician professionals in the energy & utilities industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists