Solar Farm Operations & Maintenance Checklist [FREE PDF]

Solar O&M technicians and plant managers use this checklist to inspect utility-scale solar installations per NEC Article 690 solar photovoltaic systems requirements and NFPA 70B maintenance recommendations.

  • Industry: Energy & Utilities
  • Frequency: Monthly
  • Estimated Time: 25-35 minutes
  • Role: Solar O&M Technician
  • Total Items: 8
  • Compliance: NEC Article 690, NFPA 70B

Panel & Array Condition

Inspect solar panels, racking, and array wiring.

  • Are panels free of cracks, delamination, hot spots, or visible damage?
  • Is the racking and mounting system secure with no loose hardware?
  • Are string wiring and MC4 connectors secure with no exposed conductors?
  • Panel and array notes

Inverter & Electrical Systems

Check inverter operation, combiner boxes, and electrical connections.

  • Are inverters operational with no fault codes or alarms?
  • Are combiner boxes sealed, free of moisture, and fuses intact?
  • Is the equipment grounding conductor continuous per NEC 690.43?
  • Inverter and electrical notes

Related Energy Utilities Checklists

Related Renewable Energy Checklists

Why Use This Solar Farm Operations & Maintenance Checklist [FREE PDF]?

This solar farm operations & maintenance checklist [free pdf] helps energy & utilities teams maintain compliance and operational excellence. Designed for solar o&m technician professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: monthly.

Ensures compliance with NEC Article 690, NFPA 70B. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Solar Farm Operations & Maintenance Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Panel & Array Condition, Inverter & Electrical Systems. It is designed for energy & utilities operations and compliance.

How often should this checklist be completed?

This checklist should be completed monthly. Each completion takes approximately 25-35 minutes.

Who should use this Solar Farm Operations & Maintenance Checklist [FREE PDF]?

This checklist is designed for Solar O&M Technician professionals in the energy & utilities industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists