Solar Panel Installation Inspection Checklist
Comprehensive solar panel installation inspection checklist covering NEC, IBC, and local building code requirements for residential and commercial PV systems.
- Industry: Energy
- Frequency: Per installation
- Estimated Time: 45-60 minutes
- Role: Solar Inspector/Electrician
- Total Items: 22
- Compliance: NEC Article 690, IBC 2021, UL 1703/1741, IEEE 1547
Structural & Mounting
Roof and mounting system integrity
- Roof structure adequate for load?
- Racking system properly secured?
- Roof penetrations properly flashed/sealed?
- Wind load rating met per local code?
Electrical Wiring & Conduit
DC and AC wiring per NEC 690
- Wire sizing per NEC calculations?
- Conduit properly supported and secured?
- All connections properly torqued?
- Wire management neat and protected?
Grounding & Bonding
Equipment grounding per NEC 690.43
- All equipment properly grounded?
- Grounding electrode system connected?
- Bonding jumpers properly installed?
Disconnects & Safety
Rapid shutdown and disconnect switches
- AC disconnect accessible and labeled?
- DC disconnect properly rated?
- Rapid shutdown system functional (NEC 690.12)?
- All required warning labels installed?
Inverter & Metering
Inverter installation and utility interconnection
- Inverter properly mounted?
- Anti-islanding protection verified?
- Production meter installed if required?
Final Testing & Sign-Off
System commissioning and approval
- Open circuit voltage within spec?
- Insulation resistance test passed?
- System producing power correctly?
- Inspector Signature
Related Energy Utilities Checklists
Related Renewable Energy Checklists
Why Use This Solar Panel Installation Inspection Checklist?
This solar panel installation inspection checklist helps energy teams maintain compliance and operational excellence. Designed for solar inspector/electrician professionals, this checklist covers 22 critical inspection points across 6 sections. Recommended frequency: per installation.
Ensures compliance with NEC Article 690, IBC 2021, UL 1703/1741, IEEE 1547. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Solar Panel Installation Inspection Checklist cover?
This checklist covers 22 inspection items across 6 sections: Structural & Mounting, Electrical Wiring & Conduit, Grounding & Bonding, Disconnects & Safety, Inverter & Metering, Final Testing & Sign-Off. It is designed for energy operations and compliance.
How often should this checklist be completed?
This checklist should be completed per installation. Each completion takes approximately 45-60 minutes.
Who should use this Solar Panel Installation Inspection Checklist?
This checklist is designed for Solar Inspector/Electrician professionals in the energy industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.