Wetlands and Waters of the US Compliance Checklist [FREE PDF]
This wetlands and waters of the us compliance checklist ensures compliance with Clean Water Act Section 404 Wetlands requirements. Environmental Compliance Specialists use this checklist to document compliance, identify deficiencies, and maintain regulatory standing.
- Industry: Construction / Real Estate
- Frequency: Per Project / Annually
- Estimated Time: 2-4 hours
- Role: Environmental Compliance Specialist
- Total Items: 21
- Compliance: Clean Water Act Section 404 Wetlands, Army Corps 33 CFR Part 323, EPA Section 401 Water Quality Certification, State Wetlands Permit Program
Pre-Inspection Documentation
Verify records, permits, and prior findings before beginning inspection.
- All required permits and registrations current and available?
- Prior violation corrective actions verified as complete?
- Emergency response plan current and distributed?
- Required inspection records from prior periods complete?
Operational Compliance
Verify day-to-day operational compliance with regulatory requirements.
- All required operational procedures being followed?
- Required monitoring and sampling up to date?
- All permitted limits (discharge, emissions, etc.) currently being met?
- Logbooks and operational records current and complete?
- All personnel current on required regulatory training?
Equipment and Systems Condition
Inspect treatment, containment, and monitoring equipment.
- All required treatment and control equipment operational?
- Alarms and automatic shutoffs functional?
- Secondary containment structures intact and free of defects?
- Monitoring equipment calibrated and within calibration date?
Recordkeeping and Reporting
Verify recordkeeping meets regulatory requirements.
- All required records maintained and legible?
- Required regulatory reports submitted on schedule?
- Electronic records backed up and accessible?
- Recordkeeping findings and gaps
Findings and Closeout
Document inspection findings and corrective action plans.
- Any regulatory violations or deficiencies identified?
- Corrective actions documented with responsible party and due date?
- Photo documentation of findings?
- Inspector findings and recommendations
Related Environmental Checklists
- Greenhouse Gas Emissions Monitoring Checklist [FREE PDF]
- Radon Testing and Mitigation Verification Checklist [FREE PDF]
- Brownfield Site Assessment Phase I/II Checklist [FREE PDF]
- Ambient Air Quality Monitoring Station Checklist [FREE PDF]
Why Use This Wetlands and Waters of the US Compliance Checklist [FREE PDF]?
This wetlands and waters of the us compliance checklist [free pdf] helps construction / real estate teams maintain compliance and operational excellence. Designed for environmental compliance specialist professionals, this checklist covers 21 critical inspection points across 5 sections. Recommended frequency: per project / annually.
Ensures compliance with Clean Water Act Section 404 Wetlands, Army Corps 33 CFR Part 323, EPA Section 401 Water Quality Certification, State Wetlands Permit Program. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Wetlands and Waters of the US Compliance Checklist [FREE PDF] cover?
This checklist covers 21 inspection items across 5 sections: Pre-Inspection Documentation, Operational Compliance, Equipment and Systems Condition, Recordkeeping and Reporting, Findings and Closeout. It is designed for construction / real estate operations and compliance.
How often should this checklist be completed?
This checklist should be completed per project / annually. Each completion takes approximately 2-4 hours.
Who should use this Wetlands and Waters of the US Compliance Checklist [FREE PDF]?
This checklist is designed for Environmental Compliance Specialist professionals in the construction / real estate industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.