5G Cell Site Acquisition and Zoning Compliance Checklist
This 5G cell site acquisition and zoning compliance checklist ensures adherence to FCC 47 CFR 1.6003 Shot Clock Rules, Telecom Act Section 6409(a) Eligible Facilities Request procedures, National Environmental Policy Act (NEPA) review requirements, and National Historic Preservation Act Section 106 obligations. Designed for site acquisition managers and municipal coordinators.
- Industry: Telecommunications & IT
- Frequency: Per Site Acquisition
- Estimated Time: 45-60 minutes
- Role: Site Acquisition Manager / RF Real Estate Specialist
- Total Items: 17
- Compliance: FCC 47 CFR 1.6003 Shot Clock for Wireless Facility Siting, Telecom Act Section 6409(a) Eligible Facilities Requests, National Environmental Policy Act (NEPA) 42 USC 4321, National Historic Preservation Act Section 106, FCC Orders on Accelerating Wireless Broadband Deployment
Property and Lease
Landlord identification, lease execution, and access rights.
- Property owner/landlord identified and initial contact made?
- Ground lease or rooftop license agreement executed?
- Lease term sufficient (minimum 20 years with renewal options)?
- 24/7 access rights and utility easements included?
- ALTA/NSPS land title survey completed?
Zoning and Local Permitting
Municipal zoning review and permit application tracking.
- Local zoning code reviewed for wireless facility provisions?
- Building permit or wireless facility application submitted?
- FCC Shot Clock deadline tracked in project management system?
- Site qualifies for Sec 6409(a) EFR streamlined review?
Environmental and Historic Review
NEPA categorical exclusion and Section 106 NHPA review.
- NEPA environmental review/categorical exclusion completed?
- NHPA Section 106 historic preservation review completed?
- Tribal historic preservation consultation completed if required?
- Environmental Review Notes
Approval Status and Deployment Timeline
Permit approval milestones and construction readiness.
- All permits received and construction-ready?
- Construction start date confirmed and contractor mobilized?
- Target in-service date within business plan timeline?
- Site Acquisition Notes and Blocking Issues
Related IT & Data Security Checklists
- Fiber Optic Splicing Quality and Compliance Checklist
- OTDR Acceptance Test and Fiber Link Certification Checklist
- Aerial Fiber Cable Installation and Lashing Checklist
- Underground Fiber Conduit Installation and OSP Checklist
- ISO 27001:2022 ISMS Internal Audit Checklist
- SOC 2 Type II Audit Readiness Assessment Checklist
- PCI DSS v4.0 Compliance Self-Assessment Checklist
- Zero Trust Architecture Maturity Assessment Checklist
Related Telecom Checklists
- 5G Cell Tower Safety and Annual Structural Inspection Checklist - FREE Download
- 5G Small Cell Installation and Commissioning Checklist - FREE Download
- 5G NR RF Drive Test and Coverage Verification Checklist - FREE Download
- 5G Core Network Security Assessment Checklist - FREE Download
- 5G Network Slicing SLA and QoS Configuration Audit Checklist - FREE Download
- 5G Spectrum Management and Interference Audit Checklist - FREE Download
- Fiber Optic Splicing Quality and Compliance Checklist - FREE Download
- OTDR Acceptance Test and Fiber Link Certification Checklist - FREE Download
- Aerial Fiber Cable Installation and Lashing Checklist - FREE Download
- Underground Fiber Conduit Installation and OSP Checklist - FREE Download
Why Use This 5G Cell Site Acquisition and Zoning Compliance Checklist?
This 5g cell site acquisition and zoning compliance checklist helps telecommunications & it teams maintain compliance and operational excellence. Designed for site acquisition manager / rf real estate specialist professionals, this checklist covers 17 critical inspection points across 4 sections. Recommended frequency: per site acquisition.
Ensures compliance with FCC 47 CFR 1.6003 Shot Clock for Wireless Facility Siting, Telecom Act Section 6409(a) Eligible Facilities Requests, National Environmental Policy Act (NEPA) 42 USC 4321, National Historic Preservation Act Section 106, FCC Orders on Accelerating Wireless Broadband Deployment. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the 5G Cell Site Acquisition and Zoning Compliance Checklist cover?
This checklist covers 17 inspection items across 4 sections: Property and Lease, Zoning and Local Permitting, Environmental and Historic Review, Approval Status and Deployment Timeline. It is designed for telecommunications & it operations and compliance.
How often should this checklist be completed?
This checklist should be completed per site acquisition. Each completion takes approximately 45-60 minutes.
Who should use this 5G Cell Site Acquisition and Zoning Compliance Checklist?
This checklist is designed for Site Acquisition Manager / RF Real Estate Specialist professionals in the telecommunications & it industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.