PPAP Submission Review
Complete per submission.
- Industry: Manufacturing
- Frequency: Per new product/change
- Estimated Time: 2-4 hours
- Role: Quality Engineer
- Total Items: 30
- Compliance: AIAG PPAP
PPAP Review
Review PPAP package.
- All required elements present?
- PSW complete?
- Dimensional results acceptable?
Pre-Shift Verification & Setup
Initial verification before operations begin
- Operator / Inspector Name
- Date
- Shift Number
- Production Line / Area
- Previous shift handover notes reviewed?
Safety Protocols & Compliance
Verify all safety measures are in place per OSHA standards
- LOTO procedures verified for all equipment?
- All machine guards in place and secured?
- Emergency stop buttons tested and functional?
- Required PPE worn by all operators?
- Safety signage visible and current?
Equipment & Operational Readiness
Verify equipment is calibrated and operational
- Equipment calibration current and documented?
- All gauges and instruments reading correctly?
- Lubrication schedule maintained?
- Any abnormal sounds, vibrations, or leaks?
Quality Control Standards
Verify product quality meets specifications
- Current specifications/work instructions available?
- First article inspection completed?
- Measurement tools calibrated and in tolerance?
- Reject/scrap rate within acceptable limits?
Housekeeping & Work Environment
Workplace cleanliness and environmental conditions
- 5S standards maintained (Sort, Set, Shine, Standardize, Sustain)?
- Spill containment and cleanup supplies available?
- Ventilation adequate in work area?
- Waste properly segregated and disposed?
Documentation & Records
Complete all required documentation and reporting
- Production logs updated with current data?
- Any non-conformances documented on NCR?
- Corrective actions identified and assigned?
- Supervisor Signature
- Additional Remarks
Related Manufacturing Checklists
- FMEA Review
- Measurement System Analysis
- In-Process Quality Check
- Receiving Inspection
- Shift Start Production Readiness
- End of Shift Shutdown & Handover
- Line Clearance Verification
- WIP Management Check
Related Quality Assurance Checklists
- Quality Control Inspection Checklist - FREE Download
- Incoming Material Inspection - Quality Assurance Checklist - FREE Download
- Final Inspection - FREE Download
- Non-Conformance Report - FREE Download
- Corrective Action Tracking - FREE Download
- Scrap Tracking Log - FREE Download
- Rework Verification - FREE Download
- Batch Record Review - FREE Download
- In-Process Inspection - FREE Download
- Gauge Calibration - FREE Download
Why Use This PPAP Submission Review?
This ppap submission review helps manufacturing teams maintain compliance and operational excellence. Designed for quality engineer professionals, this checklist covers 30 critical inspection points across 7 sections. Recommended frequency: per new product/change.
Ensures compliance with AIAG PPAP. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the PPAP Submission Review cover?
This checklist covers 30 inspection items across 7 sections: PPAP Review, Pre-Shift Verification & Setup, Safety Protocols & Compliance, Equipment & Operational Readiness, Quality Control Standards, Housekeeping & Work Environment, Documentation & Records. It is designed for manufacturing operations and compliance.
How often should this checklist be completed?
This checklist should be completed per new product/change. Each completion takes approximately 2-4 hours.
Who should use this PPAP Submission Review?
This checklist is designed for Quality Engineer professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.