PUWER 1998 & BS EN ISO 10218 Industrial Robotics Safety Audit
This checklist covers compliance with Provision and Use of Work Equipment Regulations 1998 (PUWER) and applicable UK statutory requirements for manufacturing operations. Non-compliance can result in unlimited fines and up to two years imprisonment under Section 33 of the Health and Safety at Work etc. Act 1974, plus Corporate Manslaughter prosecution.
- Industry: Manufacturing
- Frequency: Quarterly
- Estimated Time: 20-30 minutes
- Role: Automation Safety Engineer
- Total Items: 20
- Compliance: Provision and Use of Work Equipment Regulations 1998 (PUWER), Health and Safety at Work etc. Act 1974 Section 2, BS EN ISO 11161, BS EN 1037
PUWER Equipment Suitability & Maintenance Compliance
Verify work equipment suitability, inspection records, and guarding per PUWER 1998.
- Is every piece of work equipment suitable for its intended use and maintained in a safe condition?
- Are inspections carried out at appropriate intervals and records retained?
- Is work equipment adequately guarded to prevent access to dangerous parts?
- Attach photo of work equipment register, inspection records, and guarding assessment:
Competence, Monitoring & Outstanding Actions
Verify worker competence, active monitoring programme, and outstanding corrective actions.
- Are all workers competent for their tasks (trained, experienced, or supervised as appropriate)?
- Is monitoring and measurement of key compliance indicators carried out at required frequencies?
- Number of outstanding corrective actions from previous inspection or audit:
- Attach photo of training records, monitoring reports, and corrective action tracker:
Emergency Procedures, Signage & Legal Notices
Verify emergency procedures, mandatory statutory signage, and drill records.
- Are emergency procedures documented, practiced through drills, and records maintained?
- Are all statutory notices, signage, and warnings correctly displayed per applicable regulations?
- Overall compliance with applicable UK statutory requirements:
- Attach photo of emergency drill records, statutory signage register, and compliance certificates:
Enforcement Compliance & Management Review
Verify enforcement notice compliance, management review programme, and senior accountability.
- Have all findings from previous regulatory inspections, enforcement notices, and prohibition orders been resolved?
- Is management review of the health and safety management system conducted at least annually?
- Number of open enforcement actions or improvement notices outstanding:
- Senior Responsible Officer certification of inspection completion:
Corrective Actions & Inspector Sign-Off
Document all deficiencies and assign corrective actions. POPProbe auto-assigns these to team members, generates a signed PDF report instantly, and tracks compliance status across all locations. -> Start free, no credit card required
- List all deficiencies identified in this inspection:
- Overall compliance status?
- Corrective actions assigned to (name and department):
- Inspector digital signature and date:
Related Uk Workplace Safety Checklists
- PUWER 1998 & BS EN 60825-1 Laser Equipment Safety Compliance
- UK PUWER Work Equipment Assessment Checklist
- PUWER 1998 Machinery Guarding & Physical Safeguards Inspection
- PUWER 1998 Regulation 5 Work Equipment Maintenance Log Audit
- COSHH 2002 & HSE Nail Salon Acrylic & Gel Chemical Safety Audit
- COSHH 2002 & PUWER 1998 Automotive Repair Workshop Safety Audit
- UK COSHH Assessment Checklist
- UK Manual Handling Assessment Checklist
Related Puwer Compliance Checklists
- UK PUWER Work Equipment Assessment Checklist - FREE Download
- PUWER 1998 Machinery Guarding & Physical Safeguards Inspection - FREE Download
- PUWER 1998 Regulation 5 Work Equipment Maintenance Log Audit - FREE Download
- PUWER 1998 Regulation 8 Work Equipment Operator Training Audit - FREE Download
- PUWER 1998 Regulation 6 Work Equipment Inspection Records Audit - FREE Download
- PUWER 1998 Power Press & Brake Guards Inspection Checklist - FREE Download
- PUWER 1998 & HSE HSG17 Abrasive Wheels Inspection & Training - FREE Download
- PUWER 1998 & HSE Circular Saw Guarding & Safety Checklist - FREE Download
- PUWER 1998 Conveyor Belt & Automated Systems Safety Checklist - FREE Download
- PUWER 1998 Power Press Annual Inspection & Guard Compliance - FREE Download
Why Use This PUWER 1998 & BS EN ISO 10218 Industrial Robotics Safety Audit?
This puwer 1998 & bs en iso 10218 industrial robotics safety audit helps manufacturing teams maintain compliance and operational excellence. Designed for automation safety engineer professionals, this checklist covers 20 critical inspection points across 5 sections. Recommended frequency: quarterly.
Ensures compliance with Provision and Use of Work Equipment Regulations 1998 (PUWER), Health and Safety at Work etc. Act 1974 Section 2, BS EN ISO 11161, BS EN 1037. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the PUWER 1998 & BS EN ISO 10218 Industrial Robotics Safety Audit cover?
This checklist covers 20 inspection items across 5 sections: PUWER Equipment Suitability & Maintenance Compliance, Competence, Monitoring & Outstanding Actions, Emergency Procedures, Signage & Legal Notices, Enforcement Compliance & Management Review, Corrective Actions & Inspector Sign-Off. It is designed for manufacturing operations and compliance.
How often should this checklist be completed?
This checklist should be completed quarterly. Each completion takes approximately 20-30 minutes.
Who should use this PUWER 1998 & BS EN ISO 10218 Industrial Robotics Safety Audit?
This checklist is designed for Automation Safety Engineer professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.