Aerial Work Platform Pre-Use Inspection Checklist [FREE PDF]

Equipment operators and safety supervisors use this checklist for aerial work platform pre-use inspections per OSHA 29 CFR 1910.67 vehicle-mounted elevating platforms and ANSI A92 aerial device safety standards.

  • Industry: Construction & Maintenance
  • Frequency: Per Shift
  • Estimated Time: 10-15 minutes
  • Role: Equipment Operator
  • Total Items: 8
  • Compliance: OSHA 29 CFR 1910.67, ANSI A92.2/A92.6

Base Unit & Tires

Inspect base vehicle, outriggers, and tires.

  • Are tires properly inflated with no cuts, bulges, or excessive wear?
  • Are outriggers and stabilizers operational (if equipped)?
  • Are hydraulic fluid, engine oil, and fuel levels adequate?
  • Base unit notes

Platform & Controls

Test platform controls, safety devices, and fall protection.

  • Do all platform and ground controls operate properly in all functions?
  • Are platform guardrails, midrails, and toeboards in place and secure?
  • Is the operator's harness and lanyard attached to the designated anchor?
  • Platform and control notes

Related Material Handling Checklists

Related Heavy Equipment Checklists

Why Use This Aerial Work Platform Pre-Use Inspection Checklist [FREE PDF]?

This aerial work platform pre-use inspection checklist [free pdf] helps construction & maintenance teams maintain compliance and operational excellence. Designed for equipment operator professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: per shift.

Ensures compliance with OSHA 29 CFR 1910.67, ANSI A92.2/A92.6. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Aerial Work Platform Pre-Use Inspection Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Base Unit & Tires, Platform & Controls. It is designed for construction & maintenance operations and compliance.

How often should this checklist be completed?

This checklist should be completed per shift. Each completion takes approximately 10-15 minutes.

Who should use this Aerial Work Platform Pre-Use Inspection Checklist [FREE PDF]?

This checklist is designed for Equipment Operator professionals in the construction & maintenance industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists