Excavation Competent Person Inspection Checklist [FREE PDF]
Competent persons use this checklist for excavation inspections per OSHA 29 CFR 1926.651 specific excavation requirements and 1926.652 protective system requirements for trenches and excavations.
- Industry: Construction
- Frequency: Daily
- Estimated Time: 10-15 minutes
- Role: Competent Person
- Total Items: 8
- Compliance: OSHA 29 CFR 1926.651, OSHA 29 CFR 1926.652
Soil Classification & Protective Systems
Verify soil classification and appropriate protective systems.
- Has the soil been classified by a competent person (Type A, B, C, or stable rock)?
- Is an appropriate protective system in place (sloping, shoring, or shielding)?
- Is water accumulation controlled and the excavation free of hazardous atmosphere?
- Soil classification notes
Access & Utility Locates
Verify means of egress and utility protection.
- Are means of egress (ladders, ramps) within 25 feet of all workers?
- Have underground utilities been located and marked before excavation?
- Is spoil material kept at least 2 feet from the edge of the excavation?
- Access and utility notes
Related Safety Checklists
- Hazard Communication (HazCom/GHS) Program Checklist [FREE PDF]
- Workplace Ergonomics Assessment Checklist [FREE PDF]
- Walking-Working Surfaces Inspection Checklist [FREE PDF]
- Powered Industrial Truck (Forklift) Program Checklist [FREE PDF]
Why Use This Excavation Competent Person Inspection Checklist [FREE PDF]?
This excavation competent person inspection checklist [free pdf] helps construction teams maintain compliance and operational excellence. Designed for competent person professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: daily.
Ensures compliance with OSHA 29 CFR 1926.651, OSHA 29 CFR 1926.652. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Excavation Competent Person Inspection Checklist [FREE PDF] cover?
This checklist covers 8 inspection items across 2 sections: Soil Classification & Protective Systems, Access & Utility Locates. It is designed for construction operations and compliance.
How often should this checklist be completed?
This checklist should be completed daily. Each completion takes approximately 10-15 minutes.
Who should use this Excavation Competent Person Inspection Checklist [FREE PDF]?
This checklist is designed for Competent Person professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.