Telecom Data Center & Central Office Operations Checklist [FREE PDF]
This telecom data center and central office operations checklist verifies facilities meet Telcordia GR-63 Network Equipment Building System (NEBS) requirements, BICSI TDMM data center standards, and Uptime Institute tier requirements. Facilities managers use this to maintain network infrastructure reliability and uptime.
- Industry: Telecommunications
- Frequency: Monthly
- Estimated Time: 30-40 minutes
- Role: Central Office Manager / Data Center Manager
- Total Items: 8
- Compliance: Telcordia GR-63 (NEBS Level 3 requirements), BICSI TDMM (telecommunications distribution methods manual), Uptime Institute Tier Standards, TIA-942-B (telecommunications infrastructure standards for data centers)
Power Systems
Verify critical power system health.
- All UPS systems operational with no fault alarms?
- UPS battery runtime tested within past 12 months?
- Generator load tested monthly and fuel topped off?
- DC power plant (rectifiers and batteries) voltage within spec?
Cooling & Physical Security
Verify cooling and physical security.
- All CRAC/CRAH cooling units operational?
- Inlet temperatures within ASHRAE A1 range (64.4-80.6°F)?
- All access doors secured and access log current?
- Central office/data center notes
Related Telecommunications Checklists
- Telecom Network Operations Center (NOC) Checklist [FREE PDF]
- Telecom Network Operations Center (NOC) Checklist [FREE PDF]
- Telecom First Responder Network Authority (FIRSTNET) Compliance Checklist [FREE PDF]
- E911 / NG911 PSAP Compliance Inspection Checklist [FREE PDF]
- Telecom Underground Utility Excavation Safety Checklist [FREE PDF]
- 5G Small Cell Deployment Compliance Checklist [FREE PDF]
Related Network Operations Checklists
Why Use This Telecom Data Center & Central Office Operations Checklist [FREE PDF]?
This telecom data center & central office operations checklist [free pdf] helps telecommunications teams maintain compliance and operational excellence. Designed for central office manager / data center manager professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: monthly.
Ensures compliance with Telcordia GR-63 (NEBS Level 3 requirements), BICSI TDMM (telecommunications distribution methods manual), Uptime Institute Tier Standards, TIA-942-B (telecommunications infrastructure standards for data centers). Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Telecom Data Center & Central Office Operations Checklist [FREE PDF] cover?
This checklist covers 8 inspection items across 2 sections: Power Systems, Cooling & Physical Security. It is designed for telecommunications operations and compliance.
How often should this checklist be completed?
This checklist should be completed monthly. Each completion takes approximately 30-40 minutes.
Who should use this Telecom Data Center & Central Office Operations Checklist [FREE PDF]?
This checklist is designed for Central Office Manager / Data Center Manager professionals in the telecommunications industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.