Telecom Data Center & Central Office Operations Checklist [FREE PDF]

This telecom data center and central office operations checklist verifies facilities meet Telcordia GR-63 Network Equipment Building System (NEBS) requirements, BICSI TDMM data center standards, and Uptime Institute tier requirements. Facilities managers use this to maintain network infrastructure reliability and uptime.

  • Industry: Telecommunications
  • Frequency: Monthly
  • Estimated Time: 30-40 minutes
  • Role: Central Office Manager / Data Center Manager
  • Total Items: 8
  • Compliance: Telcordia GR-63 (NEBS Level 3 requirements), BICSI TDMM (telecommunications distribution methods manual), Uptime Institute Tier Standards, TIA-942-B (telecommunications infrastructure standards for data centers)

Power Systems

Verify critical power system health.

  • All UPS systems operational with no fault alarms?
  • UPS battery runtime tested within past 12 months?
  • Generator load tested monthly and fuel topped off?
  • DC power plant (rectifiers and batteries) voltage within spec?

Cooling & Physical Security

Verify cooling and physical security.

  • All CRAC/CRAH cooling units operational?
  • Inlet temperatures within ASHRAE A1 range (64.4-80.6°F)?
  • All access doors secured and access log current?
  • Central office/data center notes

Related Telecommunications Checklists

Related Network Operations Checklists

Why Use This Telecom Data Center & Central Office Operations Checklist [FREE PDF]?

This telecom data center & central office operations checklist [free pdf] helps telecommunications teams maintain compliance and operational excellence. Designed for central office manager / data center manager professionals, this checklist covers 8 critical inspection points across 2 sections. Recommended frequency: monthly.

Ensures compliance with Telcordia GR-63 (NEBS Level 3 requirements), BICSI TDMM (telecommunications distribution methods manual), Uptime Institute Tier Standards, TIA-942-B (telecommunications infrastructure standards for data centers). Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Telecom Data Center & Central Office Operations Checklist [FREE PDF] cover?

This checklist covers 8 inspection items across 2 sections: Power Systems, Cooling & Physical Security. It is designed for telecommunications operations and compliance.

How often should this checklist be completed?

This checklist should be completed monthly. Each completion takes approximately 30-40 minutes.

Who should use this Telecom Data Center & Central Office Operations Checklist [FREE PDF]?

This checklist is designed for Central Office Manager / Data Center Manager professionals in the telecommunications industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists