Control of Asbestos Regulations 2012 Asbestos Management Survey Audit
This checklist covers compliance with Control of Asbestos Regulations 2012 and applicable UK statutory requirements for construction operations. Non-compliance can result in unlimited fines and up to two years imprisonment under the Control of Asbestos Regulations 2012 and HSWA 1974.
- Industry: Construction
- Frequency: Quarterly
- Estimated Time: 20-30 minutes
- Role: Asbestos Surveyor
- Total Items: 20
- Compliance: Control of Asbestos Regulations 2012, HSE MDHS100, Licensed Contractor Requirements, HSE L143
Asbestos Management Survey & Duty-Holder Compliance
Verify Asbestos Management Survey, Management Plan, and ACM condition per CAR 2012.
- Is an Asbestos Management Survey (AMS) completed for all non-domestic premises built before 2000?
- Is the Asbestos Management Plan current, maintained, and communicated to all relevant persons?
- Are all ACMs in satisfactory condition, appropriately labelled, and not posing an immediate risk?
- Attach photo of Asbestos Management Survey report, Management Plan, and ACM condition register:
Competence, Monitoring & Outstanding Actions
Verify worker competence, active monitoring programme, and outstanding corrective actions.
- Are all workers competent for their tasks (trained, experienced, or supervised as appropriate)?
- Is monitoring and measurement of key compliance indicators carried out at required frequencies?
- Number of outstanding corrective actions from previous inspection or audit:
- Attach photo of training records, monitoring reports, and corrective action tracker:
Emergency Procedures, Signage & Legal Notices
Verify emergency procedures, mandatory statutory signage, and drill records.
- Are emergency procedures documented, practiced through drills, and records maintained?
- Are all statutory notices, signage, and warnings correctly displayed per applicable regulations?
- Overall compliance with applicable UK statutory requirements:
- Attach photo of emergency drill records, statutory signage register, and compliance certificates:
Enforcement Compliance & Management Review
Verify enforcement notice compliance, management review programme, and senior accountability.
- Have all findings from previous regulatory inspections, enforcement notices, and prohibition orders been resolved?
- Is management review of the health and safety management system conducted at least annually?
- Number of open enforcement actions or improvement notices outstanding:
- Senior Responsible Officer certification of inspection completion:
Corrective Actions & Inspector Sign-Off
Document all deficiencies and assign corrective actions. POPProbe auto-assigns these to team members, generates a signed PDF report instantly, and tracks compliance status across all locations. -> Start free, no credit card required
- List all deficiencies identified in this inspection:
- Overall compliance status?
- Corrective actions assigned to (name and department):
- Inspector digital signature and date:
Related Uk Construction Safety Checklists
- Control of Asbestos Regs 2012 Regulation 4 Asbestos Management Plan
- Control of Asbestos Regs 2012 Licensed Asbestos Removal Compliance
- Control of Asbestos Regs 2012 Air Monitoring & Clearance Inspection
- CDM Regulations 2015 Pre-Construction Phase Principal Designer Audit
- CDM Regulations 2015 Construction Phase Plan Compliance Audit
- CDM 2015 Health & Safety File Completeness & Handover Checklist
- CDM 2015 Schedule 2 Construction Site Welfare Facilities Inspection
Related Asbestos Management Checklists
- Control of Asbestos Regs 2012 Regulation 4 Asbestos Management Plan - FREE Download
- Control of Asbestos Regs 2012 Licensed Asbestos Removal Compliance - FREE Download
- Control of Asbestos Regs 2012 Air Monitoring & Clearance Inspection - FREE Download
Why Use This Control of Asbestos Regulations 2012 Asbestos Management Survey Audit?
This control of asbestos regulations 2012 asbestos management survey audit helps construction teams maintain compliance and operational excellence. Designed for asbestos surveyor professionals, this checklist covers 20 critical inspection points across 5 sections. Recommended frequency: quarterly.
Ensures compliance with Control of Asbestos Regulations 2012, HSE MDHS100, Licensed Contractor Requirements, HSE L143. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Control of Asbestos Regulations 2012 Asbestos Management Survey Audit cover?
This checklist covers 20 inspection items across 5 sections: Asbestos Management Survey & Duty-Holder Compliance, Competence, Monitoring & Outstanding Actions, Emergency Procedures, Signage & Legal Notices, Enforcement Compliance & Management Review, Corrective Actions & Inspector Sign-Off. It is designed for construction operations and compliance.
How often should this checklist be completed?
This checklist should be completed quarterly. Each completion takes approximately 20-30 minutes.
Who should use this Control of Asbestos Regulations 2012 Asbestos Management Survey Audit?
This checklist is designed for Asbestos Surveyor professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.