CDM 2015 & COSHH 2002 Construction Hazardous Substances Audit
This checklist covers compliance with Control of Substances Hazardous to Health Regulations 2002 (COSHH) and applicable UK statutory requirements for construction operations. Non-compliance can result in unlimited fines and up to two years imprisonment under COSHH Regulations 2002 and HSWA 1974 Section 33.
- Industry: Construction
- Frequency: Quarterly
- Estimated Time: 20-30 minutes
- Role: Industrial Hygienist
- Total Items: 20
- Compliance: Control of Substances Hazardous to Health Regulations 2002 (COSHH), Health and Safety at Work etc. Act 1974, EH40/2005 Workplace Exposure Limits (4th edition), BS EN 689:2018
COSHH Assessment & WEL Compliance
Verify COSHH assessments, WEL monitoring, and SDS availability per COSHH Regulations 2002.
- Is a COSHH assessment completed for every hazardous substance in use on site?
- Are Workplace Exposure Limits (WELs) monitored and recorded per EH40/2005 (4th edition)?
- Are Safety Data Sheets (SDS) current (2-year review), accessible to workers, and in English?
- Attach photo of COSHH assessments, SDS folder, and WEL monitoring records:
Pre-Construction Information, Welfare & Induction
Verify pre-construction surveys, welfare provision, and site induction compliance per CDM 2015.
- Are pre-construction surveys (asbestos, ground investigation, services) completed before work starts?
- Is a welfare provision plan in place providing toilets, washing facilities, rest area, and drinking water?
- Is site induction conducted for all workers before they begin work on site?
- Attach photo of pre-construction surveys, welfare facilities inspection, and site induction register:
Temporary Works, Scaffold & CDM File
Verify temporary works design, scaffold inspection, and CDM Health and Safety File compliance.
- Are all temporary works (excavations, propping, falsework) designed, inspected, and certified?
- Is the scaffold inspection register up to date (7-day intervals or after adverse weather)?
- Overall CDM and site safety compliance assessment:
- Attach photo of scaffold inspection tags, temporary works design, and CDM health and safety file:
H&S File, RIDDOR Reporting & Project Closeout
Verify H&S File compilation, RIDDOR incident reporting, and project closeout compliance per CDM 2015.
- Is the Health and Safety File being compiled by the Principal Designer and ready for handover at project completion?
- Is a record of RIDDOR-reportable incidents maintained and reportable incidents submitted to HSE online?
- Number of RIDDOR-reportable incidents on this project to date:
- Principal Contractor or Site Manager certification of inspection:
Corrective Actions & Inspector Sign-Off
Document all deficiencies and assign corrective actions. POPProbe auto-assigns these to team members, generates a signed PDF report instantly, and tracks compliance status across all locations. -> Start free, no credit card required
- List all deficiencies identified in this inspection:
- Overall compliance status?
- Corrective actions assigned to (name and department):
- Inspector digital signature and date:
Related Uk Construction Safety Checklists
- Building Regulations 2010 Part B Fire Safety Compliance Checklist
- Building Regulations 2010 Part M Access & Facilities Compliance Audit
- Building Regulations 2010 Part L Energy Conservation Compliance
- Building Regulations 2010 Part F Ventilation Requirements Compliance
- Building Regulations 2010 Part J Combustion Appliances Compliance
- Building Regulations 2010 Part P Electrical Safety Compliance Audit
- HSE Construction Site Daily Safety Inspection Checklist
- CDM 2015 & Local Authority Construction Hoarding Safety Inspection
Related Cdm Compliance Checklists
- UK CDM Construction Site Inspection Checklist - FREE Download
- UK Building Site Safety Walkabout Checklist - FREE Download
- UK CDM Regulations 2015 Principal Contractor Compliance Audit Checklist [FREE PDF] - FREE Download
- CDM Regulations 2015 Pre-Construction Phase Principal Designer Audit - FREE Download
- CDM Regulations 2015 Construction Phase Plan Compliance Audit - FREE Download
- CDM 2015 Health & Safety File Completeness & Handover Checklist - FREE Download
- CDM 2015 Schedule 2 Construction Site Welfare Facilities Inspection - FREE Download
- CDM 2015 Construction Site Induction Records & Content Audit - FREE Download
- CDM 2015 & WAH 2005 Scaffold Tag System Compliance Inspection - FREE Download
- CDM 2015 & WAH 2005 Excavation Daily Safety Inspection Checklist - FREE Download
Why Use This CDM 2015 & COSHH 2002 Construction Hazardous Substances Audit?
This cdm 2015 & coshh 2002 construction hazardous substances audit helps construction teams maintain compliance and operational excellence. Designed for industrial hygienist professionals, this checklist covers 20 critical inspection points across 5 sections. Recommended frequency: quarterly.
Ensures compliance with Control of Substances Hazardous to Health Regulations 2002 (COSHH), Health and Safety at Work etc. Act 1974, EH40/2005 Workplace Exposure Limits (4th edition), BS EN 689:2018. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What is a CDM 2015 & COSHH 2002 Construction Hazardous Substances Audit?
A CDM 2015 & COSHH 2002 Construction Hazardous Substances Audit is a standardized inspection form used by industrial hygienist to ensure consistent construction operations. It contains 27 inspection points organized into 5 sections. FREE PDF - CDM 2015 & COSHH 2002 Construction Hazardous Substances checklist for UK operations. Covers Control of Substances Hazardous to Health Regulations 2002 (COSHH) requirements. Download FREE template.
How often should I use this construction checklist?
This checklist is designed to be completed quarterly. Regular use ensures compliance with Control of Substances Hazardous to Health Regulations 2002 (COSHH) and Health and Safety at Work etc. Act 1974 and helps identify issues before they become problems.
Can I download this CDM 2015 & COSHH 2002 Construction Hazardous Substances Audit as a PDF?
Yes, you can download this checklist as a FREE PDF for printing or offline use. The checklist includes 27 fields across 5 sections and typically takes 20-30 minutes to complete.
What compliance standards does this checklist cover?
This checklist helps ensure compliance with Control of Substances Hazardous to Health Regulations 2002 (COSHH), Health and Safety at Work etc. Act 1974, EH40/2005 Workplace Exposure Limits (4th edition), BS EN 689:2018. Following these standards protects your organization and ensures best practices.
How do I complete this construction inspection checklist?
Begin by completing the header fields for Site / Premises Name, Inspection Date, Inspector Name & Title, and Reference / Permit Number. Work through each of the 5 sections, marking items Yes or No as applicable. Add notes for any issues found. Finally, complete the footer fields and add your signature. The entire process takes approximately 20 to 30 minutes.
What are the key sections in this construction checklist?
This construction checklist is organized into 5 key sections: COSHH Assessment & WEL Compliance, Pre-Construction Information, Welfare & Induction, Temporary Works, Scaffold & CDM File, H&S File, RIDDOR Reporting & Project Closeout, Corrective Actions & Inspector Sign-Off. Each section contains specific inspection points that industrial hygienist must verify. The structured layout ensures nothing is missed during construction inspections and makes the process efficient, typically taking 20-30 minutes to complete.
Who should use this CDM 2015 & COSHH 2002 Construction Hazardous Substances Audit?
This checklist is primarily designed for industrial hygienist working in construction operations. However, it is also valuable for quality assurance teams, safety officers, compliance managers, and supervisors who need to verify that construction standards are being met. Organizations of all sizes can benefit from using this CDM 2015 & COSHH 2002 Construction Hazardous Substances Audit to maintain consistency and accountability.