EV Charging Station Inspection

This EV Charging Station Inspection ensures systematic verification and compliance with NEC Article 625, UL 2202 requirements. Complete all sections to maintain safety, quality, and regulatory compliance. Document all findings and initiate corrective actions as required.

  • Industry: Electric Vehicles
  • Frequency: Quarterly
  • Estimated Time: 20-30 minutes
  • Role: Electrician
  • Total Items: 37
  • Compliance: NEC Article 625, UL 2202

Pre-Inspection Verification

Initial setup and documentation review before inspection.

  • Previous inspection records reviewed?
  • Inspection scope and areas defined?
  • Required PPE available and worn?
  • Inspection tools and forms ready?

Regulatory Compliance Verification

Verify compliance with applicable standards and regulations.

  • Required permits current and posted?
  • Training records current for personnel?
  • Written procedures available at point of use?
  • Required documentation maintained?
  • Required signage properly displayed?

Physical Inspection

Visual and physical inspection of equipment and areas.

  • Overall condition acceptable?
  • No visible damage or defects?
  • Safety guards and barriers in place?
  • Housekeeping standards maintained?
  • Emergency equipment accessible?
  • Exits and egress routes clear?

Operational Verification

Functional testing and operational verification.

  • Equipment operating properly?
  • Safety devices and interlocks functional?
  • Monitoring equipment calibrated?
  • No unusual conditions observed?

Findings and Corrective Actions

Document findings and assign corrective actions.

  • All deficiencies documented?
  • Corrective actions assigned with due dates?
  • Any immediate hazards addressed?
  • Photos of significant findings attached?
  • Overall Inspection Rating
  • Additional Notes and Recommendations
  • Emergency exits unobstructed and properly marked?
  • First aid supplies stocked and accessible?
  • Fire extinguisher accessible and inspection current?
  • All identified hazards documented and controlled?
  • ...and 4 more items

Initial Safety Assessment

Preliminary safety and compliance verification

  • Work area safe and hazard-free?
  • Required PPE available and in good condition?
  • Emergency exits clear and marked?
  • First aid supplies accessible?

Related Utilities Checklists

Related Electrical Systems Checklists

Why Use This EV Charging Station Inspection?

This ev charging station inspection helps electric vehicles teams maintain compliance and operational excellence. Designed for electrician professionals, this checklist covers 37 critical inspection points across 6 sections. Recommended frequency: quarterly.

Ensures compliance with NEC Article 625, UL 2202. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the EV Charging Station Inspection cover?

This checklist covers 37 inspection items across 6 sections: Pre-Inspection Verification, Regulatory Compliance Verification, Physical Inspection, Operational Verification, Findings and Corrective Actions, Initial Safety Assessment. It is designed for electric vehicles operations and compliance.

How often should this checklist be completed?

This checklist should be completed quarterly. Each completion takes approximately 20-30 minutes.

Who should use this EV Charging Station Inspection?

This checklist is designed for Electrician professionals in the electric vehicles industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.