Brazil NR-18 Construction Site Safety Daily Inspection Checklist
NR-18 (Norma Regulamentadora 18) establishes conditions and work environment standards for construction sites in Brazil including PCMAT (Program of Conditions and Work Environment), scaffolding, excavation, electrical systems, and worker welfare facilities. MTE labor auditors can fine construction companies from 2,000 to 200,000 reais per violation and order immediate shutdown of work areas presenting imminent risk to workers.
- Industry: Construction
- Frequency: Daily
- Estimated Time: 35-50 minutes
- Role: Tecnico de Seguranca do Trabalho / Engenheiro de Seguranca
- Total Items: 20
- Compliance: NR-18 (Portaria MTE 3214/78), NR-35 Trabalho em Altura, NR-10 Seguranca Eletrica
NR-18 Documentacao e Gestao de Seguranca
Core PCMAT documentation and safety management requirements.
- PCMAT aprovado por Engenheiro de Seguranca (CREA ativo), ART recolhida, e copia disponivel no canteiro para consulta?
- CIPA constituida (canteiros com 70 ou mais trabalhadores) com atas de reunioes mensais em dia?
- Todos os trabalhadores com treinamento admissional NR-18 (6 horas minimo) e treinamentos especificos para suas funcoes documentados?
- Foto da PCMAT e registros de treinamento admissional disponiveis no escritorio do canteiro
Andaimes e Plataformas de Trabalho
Scaffolding inspection, fall protection, and working platform conditions.
- Andaimes inspecionados: travamentos, prumos, rodapies, guarda-corpos a 1.20m e 0.70m em todos os lados abertos?
- Sistema de protecao coletiva contra quedas em uso para trabalhos em altura no andaime: redes, bandejas ou sistema de protetor de borda?
- Altura maxima do andaime mais alto em uso no canteiro hoje (metros):
- Foto do andaime mais alto mostrando guarda-corpos, rodape e tabuas do piso
Instalacoes Eletricas Provisorias
Temporary electrical systems, grounding, protection devices, and cable conditions.
- Quadros de distribuicao com DR (Dispositivo de Corrente Diferencial Residual) em todos os circuitos de tomadas de uso geral?
- Cabos de extensao e fiacao sem emendas volantes, sem aislamento danificado, e elevados ou protegidos nas rotas de transito?
- Numero de circuitos de tomada com DR testados hoje e confirmados funcionais:
- Foto do quadro de distribuicao provisorio com DRs visiveis e em bom estado
Instalacoes de Apoio e Higiene
Worker welfare facilities, sanitation, and site organization.
- Vestiarios e instalacoes sanitarias limpas, em numero adequado por trabalhador (1 sanitario para cada 20 trabalhadores) e com agua corrente?
- Area de refeicao coberta, com mesas e assentos suficientes, agua potavel disponivel e bebedouros em funcionamento?
- Total de trabalhadores no canteiro hoje (para verificar proporcao de instalacoes de apoio):
- Foto das instalacoes sanitarias e refeitorio mostrando condicoes atuais
Corrective Actions and Sign-Off
NR-18 requires daily inspection records to be retained for minimum 5 years. All non-conformities must be corrected before next shift when they represent imminent risk. POPProbe auto-assigns corrective actions to team members, generates a signed PDF report instantly, and tracks compliance status across all locations. Start free, no credit card required.
- List all deficiencies identified in this inspection:
- Overall compliance status?
- Corrective actions assigned to (name or department)?
- Inspector digital signature and date:
Related Construction Checklists
- NOM-031-STPS-2011 Construction Work Safety Inspection Checklist
- NOM-031-STPS-2011 Construction Work Safety Inspection Checklist
- Daily Construction Site Safety Inspection
- Scaffolding Inspection Checklist
- Excavation & Trenching Safety Inspection
- Roofing Safety Inspection Checklist
Related Construction Safety Checklists
Why Use This Brazil NR-18 Construction Site Safety Daily Inspection Checklist?
This brazil nr-18 construction site safety daily inspection checklist helps construction teams maintain compliance and operational excellence. Designed for tecnico de seguranca do trabalho / engenheiro de seguranca professionals, this checklist covers 20 critical inspection points across 5 sections. Recommended frequency: daily.
Ensures compliance with NR-18 (Portaria MTE 3214/78), NR-35 Trabalho em Altura, NR-10 Seguranca Eletrica. Regulatory-aligned for audit readiness and inspection documentation.
Frequently Asked Questions
What does the Brazil NR-18 Construction Site Safety Daily Inspection Checklist cover?
This checklist covers 20 inspection items across 5 sections: NR-18 Documentacao e Gestao de Seguranca, Andaimes e Plataformas de Trabalho, Instalacoes Eletricas Provisorias, Instalacoes de Apoio e Higiene, Corrective Actions and Sign-Off. It is designed for construction operations and compliance.
How often should this checklist be completed?
This checklist should be completed daily. Each completion takes approximately 35-50 minutes.
Who should use this Brazil NR-18 Construction Site Safety Daily Inspection Checklist?
This checklist is designed for Tecnico de Seguranca do Trabalho / Engenheiro de Seguranca professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.
Can I download this checklist as a PDF?
Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.