Welding Equipment Daily Inspection - FREE PDF

Daily welding equipment inspection for arc welding (MIG, TIG, stick) and gas welding/cutting. Verify electrical connections, gas fittings, cables, and PPE before starting hot work.

  • Industry: Construction / Manufacturing / Shipbuilding
  • Frequency: Daily / Before each use
  • Estimated Time: 10-15 minutes
  • Role: Welder / Hot Work Supervisor
  • Total Items: 29
  • Compliance: OSHA 1926.351, OSHA 1926.352, AWS Z49.1, NFPA 51B

Electrical Components

Arc welding electrical

  • Power cord in good condition?
  • Ground clamp secure and clean?
  • Electrode holder/gun in good condition?
  • Welding cables free of damage?
  • All electrical connections tight?

Gas Equipment

For MIG/TIG/Oxy-fuel

  • Gas cylinders secured upright?
  • Regulators in good condition?
  • Hoses free from leaks and damage?
  • Flashback arrestors installed (oxy-fuel)?
  • Cylinder valve wrench in place?

Welding Machine

Machine condition

  • Machine clean and free of debris?
  • Ventilation openings clear?
  • Controls and settings function?
  • Wire feed mechanism works (MIG)?

PPE Verification

Personal protection

  • Welding helmet with proper shade?
  • Lens free from cracks?
  • Welding gloves in good condition?
  • Flame-resistant clothing worn?
  • Respiratory protection if needed?

Work Area

Hot work environment

  • Combustibles removed or protected?
  • Fire watch assigned if required?
  • Fire extinguisher within 35 feet?
  • Hot work permit in place (if required)?
  • Equipment Status
  • Defects/Notes

PPE Compliance Verification

Personal protective equipment inspection

  • Hard hats worn in required areas?
  • Safety glasses/goggles worn as required?
  • High-visibility vests worn?
  • Steel-toe boots worn by all workers?