Construction Hot Work Welding Cutting Permit Checklist

Comprehensive hot work permit checklist for welding, cutting, and brazing operations on construction sites.

  • Industry: Construction
  • Frequency: Per hot work operation
  • Estimated Time: 15-20 minutes
  • Role: Supervisor/Safety Manager
  • Total Items: 30
  • Compliance: OSHA 1926.350-354, NFPA 51B, ANSI Z49.1

Fire Prevention

Before hot work

  • Combustibles removed/protected (35 ft radius)?
  • Floors swept clean?
  • Floor/wall openings covered?
  • Fire extinguisher within 25 ft?

Fire Watch

Fire watch requirements

  • Fire watch assigned?
  • Fire watch trained?
  • Fire watch to continue 30+ min after work?

Equipment

Welding equipment

  • Equipment inspected?
  • Hoses and connections secure?
  • Regulators working properly?

Ventilation

Air quality

  • Adequate ventilation?
  • Confined space procedures followed (if applicable)?

PPE

Personal protection

  • Proper welding helmet/shield?
  • Appropriate gloves?
  • Flame-resistant clothing?

Pre-Inspection Setup & Documentation

Initial documentation and site preparation verification

  • Inspector Name
  • Inspection Date
  • Project Name / Job Number
  • Current Weather Conditions
  • Previous inspection findings reviewed?

Safety & Compliance Verification

Verify compliance with applicable OSHA regulations and site safety plan

  • Site safety plan posted and accessible?
  • All required permits current and displayed?
  • SDS/MSDS sheets available for all chemicals on site?
  • First aid supplies accessible and stocked?
  • Emergency contact information posted?

Personal Protective Equipment (PPE)

Verify all personnel have and are using appropriate PPE

  • Hard hats worn by all personnel?
  • Safety glasses/eye protection in use?
  • High-visibility vests worn where required?
  • Steel-toe/safety footwear worn?
  • PPE in good condition (no damage)?